If you believe major infrastructure decisions should be transparent and evidence-based, please share this thread.
15/15
If you believe major infrastructure decisions should be transparent and evidence-based, please share this thread.
15/15
It's about administrative transparency.
If government changes a commitment affecting public health, shouldn't the evidence supporting that decision be available for public scrutiny?
14/15
@mon4kooyong.bsky.social
It's about administrative transparency.
If government changes a commitment affecting public health, shouldn't the evidence supporting that decision be available for public scrutiny?
14/15
@mon4kooyong.bsky.social
Every Victorian affected by a major infrastructure project should expect:
• genuine consultation
• transparent decision-making
• equal application of health protections
• access to the evidence supporting decisions.
@sophietorney.bsky.social
13/15
Every Victorian affected by a major infrastructure project should expect:
• genuine consultation
• transparent decision-making
• equal application of health protections
• access to the evidence supporting decisions.
@sophietorney.bsky.social
13/15
But if no allowance for planned freeway closures had been made to allow for noise wall construction, the question arises:
How open was that consultation process?
12/15
But if no allowance for planned freeway closures had been made to allow for noise wall construction, the question arises:
How open was that consultation process?
12/15
Replacing the walls would require additional freeway closures that were not planned within the current construction program.
If so, that has major implications for understanding how this decision was made.
11/15
Replacing the walls would require additional freeway closures that were not planned within the current construction program.
If so, that has major implications for understanding how this decision was made.
11/15
If new noise walls are technically feasible, why are the old noise walls being retained?
And why is this community being wedged by an impossible choice between protection of tress and new efficient noise walls?
10/15
If new noise walls are technically feasible, why are the old noise walls being retained?
And why is this community being wedged by an impossible choice between protection of tress and new efficient noise walls?
10/15
But this is not the only option: the existing walls were originally built from the freeway side.
9/15
But this is not the only option: the existing walls were originally built from the freeway side.
9/15
To date, residents have not received a substantive response addressing the technical issues they raised.
8/15
To date, residents have not received a substantive response addressing the technical issues they raised.
8/15
The evidence they found suggested the existing plywood walls:
• are beyond their design life
• do not meet sustainability & performance standards
• will require increasing maintenance over time
7/15
The evidence they found suggested the existing plywood walls:
• are beyond their design life
• do not meet sustainability & performance standards
• will require increasing maintenance over time
7/15
What engineering assessments support this decision?
They requested the reports & data determining that 30-year-old plywood walls could continue performing for decades into the future.
This material has not been released.
6/15
What engineering assessments support this decision?
They requested the reports & data determining that 30-year-old plywood walls could continue performing for decades into the future.
This material has not been released.
6/15
In 2025 the Victorian Government announced the old plywood walls would instead be retained.
The community was told these walls would be repaired, painted and expected to continue providing protection for another 30 years.
5/15
In 2025 the Victorian Government announced the old plywood walls would instead be retained.
The community was told these walls would be repaired, painted and expected to continue providing protection for another 30 years.
5/15
This was shown in the Environmental Effects Statement and associated alignment plans.
Residents therefore expected replacement with modern noise barriers.
4/15
This was shown in the Environmental Effects Statement and associated alignment plans.
Residents therefore expected replacement with modern noise barriers.
4/15
In the early 1990s these plywood noise walls were installed after community advocacy.
They met the standards of their day.
Today they are more than 30 years old and at the end of their intended design life.
3/15
In the early 1990s these plywood noise walls were installed after community advocacy.
They met the standards of their day.
Today they are more than 30 years old and at the end of their intended design life.
3/15
The question is simple:
Why are these 30-year-old walls being retained while other communities receive new walls built to current standards?
2/15
The question is simple:
Why are these 30-year-old walls being retained while other communities receive new walls built to current standards?
2/15
Solar, wind, batteries, EVs are machines that kill fascism
Solar, wind, batteries, EVs are machines that kill fascism