#AERLITE
Cell-Crete gravity-fed 2,000 CY of Aerlite®-iX LDCC for annular filling in Oklahoma's Atoka Pipeline Project.

Learn more: https://aerixindustries.com/featured-case-studies/

#AERLITEiX #AerixIndustries
November 19, 2026 at 3:00 PM
6,500 CY of Aerlite®-iX LDCC helped retire 12.5 miles of gas lines in Atlanta.

Learn more: https://aerixindustries.com/featured-case-studies/

#AERLITEiX #AerixIndustries
November 17, 2026 at 3:01 PM
Aerlite®-iX LDCC helped secure a sliplining repair in Lexington, reducing disruption and labor.

Learn more: https://aerixindustries.com/featured-case-studies/

#Sliplining #AerixIndustries
November 16, 2026 at 3:01 PM
1,100 CY of Aerlite®-iX LDCC helped manage TBM loads for Chicago's flood diversion tunnel.

Learn more: https://aerixindustries.com/featured-case-studies/

#AERLITEiX #AerixIndustries
November 13, 2026 at 3:30 PM
3,000+ CY of Aerlite®-iX LDCC helped protect buried utilities at Waterfront Seattle.

Learn more: https://aerixindustries.com/featured-case-studies/

#AERLITEiX #AerixIndustries
November 12, 2026 at 3:10 PM
Aerlite®-iX and AQUAERiX® provide lightweight, flowable backfill for recessed pools, helping manage settlement and drainage.

Learn more: https://aerixindustries.com/featured-case-studies/

#PoolConstruction #AerixIndustries
November 10, 2026 at 3:01 PM
Aerlite®-iX LDCC provided flowable, lightweight backfill beneath the AK-Chin Casino gaming floor.

Learn more: https://aerixindustries.com/featured-case-studies/

#AERLITEiX #LDCC #AerixIndustries
November 9, 2026 at 3:01 PM
5,000 yd³ of 30 pcf Aerlite®-iX LDCC helped address liquefaction and lateral pressure at a key bridge abutment on the 57/60 Interchange.

Learn more: https://aerixindustries.com/featured-case-studies/

#DiamondBar #AERLITEiX #AerixIndustries
October 30, 2026 at 2:00 PM
Aerlite® LDCC filled a 345-ft box culvert in Arlington, with 1,100 yd³ pumped from one access point in just three days.

Learn more: https://aerixindustries.com/featured-case-studies/

#Arlington #AERLITE #AerixIndustries
October 28, 2026 at 2:00 PM
Aerlite®-iX LDCC provided lightweight hillside backfill for Wasatch Elementary School, reducing loads on retaining walls without requiring compaction.

Learn more: https://aerixindustries.com/featured-case-studies/

#Provo #AERLITEiX #AerixIndustries
October 27, 2026 at 2:00 PM
Aerlite®-iX LDCC provided lightweight structural backfill for a 71,000-ft² Topgolf facility built on a former landfill.

Learn more: https://aerixindustries.com/featured-case-studies/

#Burlingame #AERLITEiX #AerixIndustries
October 19, 2026 at 2:00 PM
Aerlite®-iX helped replace three highway bridges at Baltimore’s Sparrows Point, reducing settlement risk and foundation loads over compressible soils.

Learn more: https://aerixindustries.com/featured-case-studies/

#Baltimore #AERLITEiX #Infrastructure #AerixIndustries
October 13, 2026 at 2:00 PM
Aerlite®-iX LDCC enabled “net-zero loading” for Seattle’s SR 520/I-5 connection, protecting an existing tunnel from additional overburden stress.

Learn more: https://aerixindustries.com/featured-case-studies/

#Seattle #AERLITEiX #TunnelProtection #AerixIndustries
October 8, 2026 at 2:00 PM
Aerlite® LDCC helped widen 2.5 miles of Florida State Road 50 while reducing lateral loads and settlement risks over soft organic soils.

Learn more: https://aerixindustries.com/featured-case-studies/

#Ocoee #AERLITE #AerixIndustries
October 7, 2026 at 2:00 PM
2,400 yd³ of Aerlite®-iX LDCC helped stabilize bridge abutments at Sam Snyder Creek, supporting fish passage and completing backfill in just one week.

Learn more: https://aerixindustries.com/featured-case-studies/

#Poulsbo #AERLITEiX #FishPassage #AerixIndustries
October 6, 2026 at 2:00 PM
Aerlite®-iX LDCC supported a new Route 202 culvert in Malvern, with 18,000 cubic yards installed at 1,000 yd³ per day.

Learn more: https://aerixindustries.com/featured-case-studies/

#Malvern #AERLITEiX #PennDOT #AerixIndustries
September 30, 2026 at 2:00 PM
Aerlite®-iX LDCC filled 29-ft-high counterweight pits beneath NYC’s historic Roosevelt Avenue Bridge while meeting strict density and strength requirements.

Learn more: https://aerixindustries.com/featured-case-studies/

#Flushing #BridgeRehab #AERLITEiX #AerixIndustries
September 25, 2026 at 2:00 PM
Aerlite®-iX LDCC forms a crushable layer in LA Metro’s Purple Line tunnels, designed to accommodate up to 20 inches of fault movement.

Learn more: https://aerixindustries.com/featured-case-studies/

#LosAngeles #SeismicSafety #AERLITEiX #AerixIndustries
September 17, 2026 at 2:00 PM
Aquaerix®-HD and Aerlite®-iX LDCC provided lightweight, self-leveling subbase fill for the new Portal North Bridge in challenging marshland conditions.

Learn more: https://aerixindustries.com/featured-case-studies/

#Secaucus #Railway #AERLITEiX #AerixIndustries
September 14, 2026 at 2:00 PM
Aerlite®-iX LDCC provided lightweight foundation backfill for Pittsburgh’s Consol Energy Center, supporting structural stability and LEED Gold sustainability goals.

Learn more: https://aerixindustries.com/featured-case-studies/

#Pittsburgh #AERLITEiX #AerixIndustries
September 10, 2026 at 2:01 PM
Aerlite®-iX LDCC filled 2,400 LF of subaqueous pipeline in one day, helping abandon a 1962 water main while minimizing disruption to a critical hurricane evacuation route.

Learn more: https://aerixindustries.com/featured-case-studies/

#StPetersburg #AERLITEiX #AerixIndustries
September 8, 2026 at 2:01 PM
Aerlite®-iX LDCC helped provide a stable, lightweight foundation for Chester’s 170,000-sq.-ft. Sportsplex.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Chester #RecreationInfrastructure #LoadReduction #AERLITEiX #AerixIndustries
September 3, 2026 at 2:01 PM
Hurricane damage left a void beneath an NC-72 bridge. Aerlite® LDCC restored support in just 3 hours.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Fayetteville #BridgeRepair #VoidFilling #AERLITE #WashoutRemediation #AerixIndustries
September 1, 2026 at 2:00 PM
The WSFS Bank Sportsplex used Aerlite®-iX LDCC to reduce loads on soft riverfront soils and support its 170,000-sq.-ft. facility.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Chester #RecreationInfrastructure #LoadReduction #AERLITEiX #WaterfrontRevitalization #AerixIndustries
August 31, 2026 at 2:00 PM
Philadelphia Airport used Aerlite®-iX LDCC to reduce taxiway loads and settlement risk during active operations.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Philadelphia #Aviation #TaxiwayRealignment #AERLITEiX #NetZeroLoading #AerixIndustries
August 28, 2026 at 2:00 PM