#ALMM-II
India:Since ALMM List-II took effect on June 1, Chinese solar cell exports to India have fallen by more than 98%, from 2.56 GW in April to just 0.04 GW in August.

Module imports from China dropped to 0.07 GW in August, down from 2.68 GW a year earlier.
October 12, 2026 at 10:23 PM
China — India's solar imports from China drop 98% as new policies reshape trade dynamics #China #Chinese #ACC #News
China-India Solar Trade Gap Widens Amid Policy Shifts
The Indian government's recent policy changes have triggered a sharp decline in Chinese solar panel exports to the country. According to the ALMM List-II, a regulatory framework introduced in Septembe… · Photo : Richard Masoner / Cyclelicious · CC BY-SA · Flickr
news.netasgard.com
October 12, 2026 at 3:52 AM
India’s MNRE issues 12th solar cell ALMM revision, capacity reaches 37.8GW #energysky -- via pv-tech:
India’s MNRE issues 12th solar cell ALMM revision, capacity reaches 37.8GW
India’s MNRE issued the 12th revision of its Approved List of Models and Manufacturers (ALMM) List-II for solar PV cells on 8 October 2026.
www.pv-tech.org
October 10, 2026 at 1:33 AM
Gujarat's Gopin Group New Entrant In India's #ALMM-II (Solar Cells).. The new entrant-Gopin Semicon is associated with the Gujarat-based Gopin Group, a privately held business group linked to businessman Lavjibhai Daliya. www.saurenergy.com/solar-energy...

#G12R #solarcells #solarpower
October 9, 2026 at 11:43 AM
MNRE proposes standardised naming system for ALMM list-II #energysky -- via pv-tech:
MNRE proposes standardised naming system for ALMM list-II
India’s MNRE proposed standardised ALMM List-II solar PV cell nomenclature, introducing 14-character codes.
www.pv-tech.org
October 7, 2026 at 11:55 PM
First Solar Takes Its #TOPCon Patent Fight to a Chinese Plant on American Soil.
www.saurenergy.com/solar-energy...
First Solar Takes Its TOPCon Patent Fight to a Chinese Plant on American Soil
Indian manufacturers scaling TOPCon under ALMM List-II should read the filing closely, as First Solar could always expand the battleground to India as well
www.saurenergy.com
October 5, 2026 at 5:39 AM
India’s ALMM-II adds G12R TOPCon cells in ninth revision #energysky -- via pv-tech:
India’s ALMM-II adds G12R TOPCon cells in ninth revision
MNRE's ninth ALMM-II revision adds larger-format G12R N-type TOPCon cells from Emmvee, Waaree, Avaada and several others.
www.pv-tech.org
August 24, 2026 at 3:34 PM
#ALMM-II: Emmvee Group, Waaree Group Add G12R #TOPCon Cells, Avaada Electro Moves to 16BB #G12R.

Read more www.saurenergy.com/solar-energy...

#solarpower #solarenergy #RenewableEnergy
August 24, 2026 at 5:01 AM
India on track to surpass 50GWdc solar installations in 2026 #energysky -- via pv-tech:
India on track to surpass 50GWdc solar installations in 2026
India is set for record solar installations in 2026, while ALMM-II drives cell shortages and higher system prices.
www.pv-tech.org
August 17, 2026 at 8:40 PM
Saatvik Green Energy Limited — Market Notice

Saatvik Green Energy's material subsidiary, Saatvik Solar, signed an MoU with the Odisha government for a 3.6 GW Phase II solar cell facility at Gopalpur, Odisha. Phase I (2.4 GW cell, 4 GW module) is nearing commissioning with ALMM-II...

🧵 continued ↓
August 17, 2026 at 5:31 AM
For perspective, the UK has a bit over 20GW of solar installed after a couple of decades. Good progress from India.
www.pv-magazine-india.com/2026/08/13/i...
India on track for record 50 GW of solar installations in 2026 as ALMM-II drives H1 surge - pv magazine India
Wood Mackenzie expects utility-scale solar system prices to rise 20% by Q4 2026 as cell supply constraints bite.
www.pv-magazine-india.com
August 13, 2026 at 4:22 PM
'12 GW of solar PV capacity in Q2 2026, taking total installations for H1 to a record 27 GW...49% higher than the same period last year...rush to complete projects ahead of the June 1, 2026 deadline for ALMM List-II implementatio...cumulative installed capacity 165 GW at the end of June 2026'
Mercom: India Solar Installations Hit Record 27 GW In H1 2026
India added 12 GW of solar PV capacity in Q2 2026, taking total installations for H1 to a record 27 GW, according to Mercom India
taiyangnews.info
August 13, 2026 at 1:26 PM
India updates solar cell ALMM List-II, adds Avaada Electro #energysky -- via pv-tech:
India updates solar cell ALMM List-II, adds Avaada Electro
MNRE's eighth ALMM List-II revision expands Fujiyama Power's PV cell capacity and adds Avaada Electro as a new entrant.
www.pv-tech.org
July 22, 2026 at 6:18 PM
MNRE extends ALMM List-II exemption for net-metering and open access solar projects #energysky -- via pv-tech:
MNRE extends ALMM List-II exemption for net-metering and open access solar projects
India's MNRE has extended the ALMM List-II exemption for net-metering and open-access solar projects until December 2026.
www.pv-tech.org
July 20, 2026 at 11:06 PM
India’s MNRE expands ALMM List-II to 27.8GW, adds HJT cells for the first time #energysky -- via pv-tech:
India’s MNRE expands ALMM List-II to 27.8GW, adds HJT cells for the first time
India’s MNRE has expanded the ALMM List-II for solar cells to 27.8GW, and added HJT cells for the first time.
www.pv-tech.org
April 14, 2026 at 11:41 PM
MNRE adds 3GW of solar cell capacity to ALMM List-II, reaching 26GW #energysky -- via pv-tech:
MNRE adds 3GW of solar cell capacity to ALMM List-II, reaching 26GW
India’s MNREA has released the fourth revision of its ALMM II for solar cells, increasing the total enlisted manufacturing capacity to 26GW. 
www.pv-tech.org
February 11, 2026 at 10:23 PM
India adds 4.8GW solar cell capacity to ALMM list-II #energysky -- via pv-tech:
India adds 4.8GW solar cell capacity to ALMM list-II
The Indian government has added 4.8GW of annual solar cell nameplate capacity to its Approved List of Models and Manufacturers List-II.
www.pv-tech.org
September 26, 2025 at 7:34 PM
The Ministry of New and Renewable Energy (MNRE) has expanded ALMM List-II by approving Avaada Electro’s 610 MW solar cell facility and Fujiyama’s 1,077 MW capacity expansion, strengthening domestic manufacturing.
MNRE Expands ALMM List-II with Avaada Electro and Fujiyama
MNRE has expanded ALMM List-II by approving Avaada Electro’s 610 MW solar cell facility and Fujiyama’s 1,077 MW capacity expansion
www.thebatterymagazine.com
July 23, 2026 at 6:35 AM
Feed: "PV Tech"
By: Shreeyashi Ojha on Wednesday, July 22, 2026
India updates solar cell ALMM List-II, adds Avaada Electro
MNRE's eighth ALMM List-II revision expands Fujiyama Power's PV cell capacity and adds Avaada Electro as a new entrant.
www.pv-tech.org
July 22, 2026 at 4:19 PM
Feed: "PV Tech"
By: Shreeyashi Ojha on Monday, July 20, 2026
MNRE extends ALMM List-II exemption for net-metering and open access solar projects
India's MNRE has extended the ALMM List-II exemption for net-metering and open-access solar projects until December 2026.
www.pv-tech.org
July 20, 2026 at 2:48 PM
Feed: "pv magazine India"
By: Uma Gupta on Monday, May 25, 2026
Rajasthan Solar Association calls for pragmatic transition framework for ALMM List II implementation
The industry body warns of supply disruptions, rising costs, MSME stress and project delays if ground-level readiness is ignored.
www.pv-magazine-india.com
May 26, 2026 at 2:03 AM
Feed: "PV Tech"
By: Shreeyashi Ojha on Tuesday, April 14, 2026
India’s MNRE expands ALMM List-II to 27.8GW, adds HJT cells for the first time
India’s MNRE has expanded the ALMM List-II for solar cells to 27.8GW, and added HJT cells for the first time.
www.pv-tech.org
April 15, 2026 at 2:48 AM
Feed: "PV Tech"
By: Shreeyashi Ojha on Wednesday, February 11, 2026
MNRE adds 3GW of solar cell capacity to ALMM List-II, reaching 26GW
India’s MNREA has released the fourth revision of its ALMM II for solar cells, increasing the total enlisted manufacturing capacity to 26GW.
www.pv-tech.org
February 12, 2026 at 2:17 PM
Feed: "PV Tech"
By: Jonathan Touriño Jacobo on Friday, September 26, 2025
India adds 4.8GW solar cell capacity to ALMM list-II
The Indian government has added 4.8GW of annual solar cell nameplate capacity to its Approved List of Models and Manufacturers List-II.
www.pv-tech.org
September 27, 2025 at 2:37 AM