a) has built 119 miles of structure, with track-laying starting this year
b) has a lower cost premium than many US transit projects
c) costs half as much as the equivalent in highways and airports
Let's follow through and make the dream a reality! #FundHSR
a) has built 119 miles of structure, with track-laying starting this year
b) has a lower cost premium than many US transit projects
c) costs half as much as the equivalent in highways and airports
Let's follow through and make the dream a reality! #FundHSR
Crews recently resumed placing the remaining 112 girders! This is no easy task as some of these girders can be up to 10ft tall & weigh between 95-100,000 lbs.
🏗 Total pre-cast girders needed: 978
*Manufactured by Dragados-Flatiron Joint Venture #BuildCA