Meanwhile, in-vehicle touchscreens remain completely unregulated in the US.
doi.org/10.1145/3746...
@bloomberg.com
www.bloomberg.com/news/newslet...
@bloomberg.com
www.bloomberg.com/news/newslet...
🎁🔗 www.bloomberg.com/news/feature...
🎁🔗 www.bloomberg.com/news/feature...
www.boulder.noaa.gov/public-affai...
www.boulder.noaa.gov/public-affai...
Ukraine's attack has been geolocated to have hit the 100kV Orlovskaya power plant switchgear (VRP) as well as the oil storage facility there.
Videos + Geolocation from @Exilenova_plus
Ukraine's attack has been geolocated to have hit the 100kV Orlovskaya power plant switchgear (VRP) as well as the oil storage facility there.
Videos + Geolocation from @Exilenova_plus
This is the second attack on the facility this year. A fire is raging near the switchgear and boiler equipment storage. Oil pumping temporarily halted.
This is the second attack on the facility this year. A fire is raging near the switchgear and boiler equipment storage. Oil pumping temporarily halted.
The Kamysh-Burunskaya Thermal Power Plant (TPP) has an electrical capacity of 30 MW and a thermal output of 174.9 Gcal/h.
The outdoor switchgear of the KB TPP substation is located on the western side of the TPP.
The Kamysh-Burunskaya Thermal Power Plant (TPP) has an electrical capacity of 30 MW and a thermal output of 174.9 Gcal/h.
The outdoor switchgear of the KB TPP substation is located on the western side of the TPP.
vandp.net/sales/2678/1...
vandp.net/sales/2678/1...
I guarantee you that no one wants to live in buildings without power.
But lead time is already 12-16 months and boy howdy is it gonna get worse
I guarantee you that no one wants to live in buildings without power.
But lead time is already 12-16 months and boy howdy is it gonna get worse
“Almost half of the US data centers planned for this year are expected to be delayed or canceled. One big reason is the shortage of electrical equipment, such as transformers, switchgear and batteries.”
(largely imported from China)
www.bloomberg.com/news/feature...
“Almost half of the US data centers planned for this year are expected to be delayed or canceled. One big reason is the shortage of electrical equipment, such as transformers, switchgear and batteries.”
(largely imported from China)
www.bloomberg.com/news/feature...
These costs are passed on to consumers as higher electricity rates, while Blackmailer Trump makes a personal profit..
These costs are passed on to consumers as higher electricity rates, while Blackmailer Trump makes a personal profit..