Summer hours will see tramcars on the tracks from 8:30 am until 6:30 pm daily, with the last tram departing from Stop 1 at 5:50 pm every day.
Summer hours will see tramcars on the tracks from 8:30 am until 6:30 pm daily, with the last tram departing from Stop 1 at 5:50 pm every day.
Regular hours resume from Boxing Day through the holidays.
Regular hours resume from Boxing Day through the holidays.
No. 21 will be paired with former Wanganui steam tram motor No. 100 for public rides at MOTAT.
PICS David Cawood.
No. 21 will be paired with former Wanganui steam tram motor No. 100 for public rides at MOTAT.
PICS David Cawood.
Christchurch Attractions Ltd has bought extra land on Tramway Lane and is on the lookout for more trams.
Via The Press: www.thepress.co.nz/nz-news/3609...
Christchurch Attractions Ltd has bought extra land on Tramway Lane and is on the lookout for more trams.
Via The Press: www.thepress.co.nz/nz-news/3609...
Trams are now able to use the full length of track between Aviation Hall on Motions Road to Great North Road.
Trams are now able to use the full length of track between Aviation Hall on Motions Road to Great North Road.
By @harrisonmcevoy.bsky.social: substack.com/home/post/p-...
By @harrisonmcevoy.bsky.social: substack.com/home/post/p-...
Maintenance includes:
* Driver’s cabs TLC
* Relaying the floor
* New paint job
Maintenance includes:
* Driver’s cabs TLC
* Relaying the floor
* New paint job
The works are part of ongoing maintenance works.
Trams are expected to be back on track from February 14.
The works are part of ongoing maintenance works.
Trams are expected to be back on track from February 14.
Crews removed and replaced the tracks and ballast, with a test tram returning to the track ahead of a full reopening this weekend.
Crews removed and replaced the tracks and ballast, with a test tram returning to the track ahead of a full reopening this weekend.
Via Otago Daily Times: www.odt.co.nz/regions/quee...
Via Otago Daily Times: www.odt.co.nz/regions/quee...
WATCH: www.youtube.com/watch?v=KWpE...
WATCH: www.youtube.com/watch?v=KWpE...
Work has now shifted to the Motions Rd crossing.
Work has now shifted to the Motions Rd crossing.
The first section being worked on is near Western Springs College and being completed by Libbet.
The first section being worked on is near Western Springs College and being completed by Libbet.
The tram entered service on the Takapuna Tramway before being sold off to Dunedin for their tram network
Recently, ownership was passed from the Otago Settlers Museum to THS.
The tram entered service on the Takapuna Tramway before being sold off to Dunedin for their tram network
Recently, ownership was passed from the Otago Settlers Museum to THS.
A tram replacement bus will be in operation.
A tram replacement bus will be in operation.
Exothermic welding is used to join two sections of track together.
Exothermic welding is used to join two sections of track together.
The tram will be stored on higher ground until further notice.
The tram will be stored on higher ground until further notice.
WATCH: www.youtube.com/watch?v=BDBb...
WATCH: www.youtube.com/watch?v=BDBb...
Via @thepress.co.nz: www.thepress.co.nz/nz-news/3605...
Via @thepress.co.nz: www.thepress.co.nz/nz-news/3605...
The society acquired the stripped tram body in 1968, and restoration planning began in 2007.
The society acquired the stripped tram body in 1968, and restoration planning began in 2007.