#class_180
During the weekend, testing was carried out on the line south of Peterborough, as part of the £1.4 billion East Coast Digital Programme (ECDP). https://www.railadvent.co.uk/2025/11/multiple-trains-controlled-simultaneously-in-landmark-for-digital-signalling.html #class_180 #class_717
Multiple trains controlled simultaneously in landmark for digital signalling
A major step forward in the introduction of digital signalling on the East Coast Main Line took place last weekend, 22nd and 23rd November.
www.railadvent.co.uk
November 25, 2025 at 12:55 PM