#lineside
Normal practice when changing a signal route is to stop at the signal, wait for the switch to be set & proceed but that would have opened the doors. Police couldn’t hike up lineside quickly (no roads), so getting the train to a stop at a platform was critical to the fast response by armed police.
November 27, 2026 at 11:52 PM
I think that about all of them tbh! I think a they use a lot to house equipment that can't be placed lineside, even if it's just the size of am old PC
November 22, 2026 at 8:23 PM
Misread that as repurposing the lineside TPO apparatus 😬
November 18, 2026 at 9:43 AM
Why do some model railroad signs look pasted on? A short guide to realistic signs: start with a place and a date, size signs in millimeters, make wall ads look painted, and put lineside signs where the engineer needs them.

#modelrailroad #modeltrains #modelrailroading
November 18, 2026 at 3:10 PM
Passing Stanley Junction. 3 November 2026. #railway #photography
November 13, 2026 at 7:37 AM
On a foggy morning on the Tweed Lord Beith unveiled the restored ECML Lineside Sign for The Royal Border Bridge. The work was funded by Berwick Preservation Trust while the RHT gave a grant for a new lineside sign. The original’s condition wasn’t suitable for retention trackside.
November 10, 2026 at 7:59 PM
ETCS goes live in Romania at last, but challenges remain

https://www.byteseu.com/2516947/

ROMANIA: Passenger trains have started running under ETCS Level 2 on a short section of main line north of București after the long-dormant lineside equipment was put into operation.  A București – Suceava …
ETCS goes live in Romania at last, but challenges remain - Bytes Europe
ROMANIA: Passenger trains have started running under ETCS Level 2 on a short section of main line north of București after the long-dormant lineside equipment
www.byteseu.com
November 12, 2026 at 4:52 PM
Performance went off a cliff over the summer because we had a massive heatwave causing speed restrictions all over the place - particularly after the Lewes derailment. Greater Anglia and C2C both had a lot of disruption because of lineside fires.
November 7, 2026 at 11:12 PM
It's the lineside signalling that restricts trains to 125mph in the UK. It's the type of in-cab signalling on High Speed 1 (same as used on TGV services in France) that allow them to go faster.
November 5, 2026 at 3:15 PM
We post each and every day with a list of all your mainline notable moves, plus heritage schedules on our news page, which you can find at railcamlive.wordpress.com

There you can navigate to complete list from today AND tomorrow, each and every day, by hitting up the 'On The Cams' tab at the top.
Railcam UK
Bringing the Lineside to your Armchair
railcamlive.wordpress.com
November 4, 2026 at 9:00 AM
No trains will run between Peterborough or Letchworth Garden City and London on 28–29 November due to signalling and track upgrades. Rail replacement services will operate on many routes. Passengers should check before travelling.
www.networkrailmediacentre.co.uk/news/digital...
Digital signalling and track upgrades on East Coast Main Line south of Peterborough
Further digital signalling upgrade work alongside essential track and lineside improvements will mean no trains on the East Coast Main Line between Peterborough or Letchworth and London on the last we...
www.networkrailmediacentre.co.uk
November 2, 2026 at 4:24 PM
October 29, 2026 at 8:01 AM
it's using LZB*, a German system that uses radio signals from the track to tell the train what is happening up to 9.9km ahead, and based on that, what speed it can go at. This allows the trains to travel much faster and closer than with conventional lineside signals

*Linienformigezugbeeinflussung
October 28, 2026 at 3:00 PM
My understanding is when the equipment on the train is restarted, the LZB doesn't actually start controlling the train until it enters the next 12km block, and until then the train is controlled by lineside signals.
October 29, 2026 at 5:34 AM
all high speed lines use a similar system - allowing unrestricted speed without it working (if that is what happened) is insane. As most HS lines don't have lineside signalling, when it's not working the drivers would have no info, and even if there are signals as a backup, that limits the speed
October 28, 2026 at 3:00 PM