#msbstoad
66/100. A new main squeeze, getting back to Toad! #100daysofknitting #msbstoad
June 9, 2025 at 3:20 AM
78/100. Oh, how’s Toad going? Just the ends to weave in now, thanks for asking! #100daysofknitting #msbstoad
June 21, 2025 at 5:34 AM
74/100. Another Knitty Hour nibble of Purpytini collar, then right up to the last cables in Toad. #100daysofknitting #msbspurpytini #msbstoad
June 17, 2025 at 3:22 AM
71/100. A bunch more Toad tonight, almost up to the penultimate cable. And early in the evening, some Orlando Perkins spin! #100daysofknitting #msbstoad #msbsorlandoperkins
June 14, 2025 at 5:12 AM
77/100. Finished the hem ribbing on Toad! And got an armhole picked up! I also spent all afternoon spinning, but didn’t take pictures. #100daysofknitting #msbstoad
June 20, 2025 at 3:31 AM
48/100. Lucky Len is all joined up and now in “knit a tube” mode! And after plying more of Saguaro, I got to get more of Toad’s front established. #100daysofknitting #msbsluckylen #msbstoad
May 22, 2025 at 3:28 AM
70/100. Toad by daylight! Got through the next cable during WFH and this evening. Also finished the second bobbin of Pantyhose. #100daysofknitting #msbstoad
June 13, 2025 at 3:56 AM
69/100. A good afternoon of Toad (I tried it on finally; it fits!), and then an evening of slovenly singles. #100daysofknitting #msbstoad #msbspantyhose
June 12, 2025 at 4:00 AM
45/100. A lot not pictured: an afternoon of getting increasingly comfortable plying Saguaro on JumJum, then SnS on JoiBoi. Shown: an evening of almost getting to the end of the back on Toad. #100daysofknitting #msbstoad
May 19, 2025 at 3:37 AM
67/100. During Knitty Hour I got to plug away at some Purpytini, and at home I enjoyed Toad and its adorable duck pond stitch marker. #100daysofknitting #msbspurpytini #msbstoad
June 10, 2025 at 3:51 AM
50/100. SnS a little JoiBoi, a little late-evening Toad, and in the middle a ton of plying to finish off a very fat, very messy mondo skein of Saguaro. #100daysofknitting #msbsjoiboi #msbstoad #msbssaguaro
May 24, 2025 at 4:59 AM
73/100. Spent this afternoon on the tonal bobbin of the Orlando Perkins spin, then got Toad down to the last cable repeat. #100daysofknitting #msbstoad #msbsorlandoperkins
June 16, 2025 at 3:54 AM
52/100. Had a buddy all evening while I joined Toad in the round. He wasn’t much interested in my knitting — he was just here to sleep. Not pictured? Lots of spinning this afternoon. #100daysofknitting #msbstoad #hoxiesupercat
May 26, 2025 at 3:53 AM
75/100. It doesn’t look like much yet, but that’s hem ribbing starting on Toad! #100daysofknitting #msbstoad
June 18, 2025 at 3:58 AM
51/100. Cataloged a lot of my fiber stash today, dunked/snapped Saguaro, and started spinning my Krabby Patty batts. Knitted a nibble of JoiBoi, and main-squeezed Toad all the way down to the armhole join. #100daysofknitting #msbstoad
May 25, 2025 at 4:32 AM
43/100. Didn’t take a picture of significant Lucky Len progress this afternoon, but here’s some of the eternal Saguaro plying, and Maybin modeling the luscious Toad. #100daysofknitting #msbssaguaro #msbstoad
May 17, 2025 at 4:34 AM
47/100. Lucky Len is getting close to joining in the round. Becoming a caftan top in front of my eyes! And Toad looks very structurally advanced now that the front is attached. #100daysofknitting #msbsluckylen #msbstoad
May 21, 2025 at 3:54 AM
76/100. A day off meant a spinning afternoon, starting a just-for-fun Moana plying pair from Green Goat Ranch; then this evening I got two inches of Toad’s hem rib done. #100daysofknitting #msbstoad
June 19, 2025 at 4:43 AM
49/100. An evening with Toad after an afternoon with Lucky Len. I love Len’s donut stitch marker! #100daysofknitting #msbstoad #msbsluckylen
May 23, 2025 at 4:02 AM
May 15, 2025 at 3:02 AM