• computer science teaching and research (my job),
• why using generative AI is bad (still part of my job),
• language learning (my hobby),
• the fact that one must wear a f*cking FFP2-3 mask during airborne disease pandemics (my punishment, I guess).
The front page shows the finished data centre, as well as a list of pieces: 50000 × 💻, 10⁹ × 🌲, 1 × 🕯️, 1 × 🔧
The back page shows the instructions: plug the 💻, light the 🕯️, burn the 🌲 with the 🕯️ to power the 💻
The front page shows the finished data centre, as well as a list of pieces: 50000 × 💻, 10⁹ × 🌲, 1 × 🕯️, 1 × 🔧
The back page shows the instructions: plug the 💻, light the 🕯️, burn the 🌲 with the 🕯️ to power the 💻
Like, United Health's AI that's denying a shitload of claims with a 90% error rate? They wanted you to think it's just the AI.
Like, United Health's AI that's denying a shitload of claims with a 90% error rate? They wanted you to think it's just the AI.
Just not aimed at human readers anymore.
>>
TOUT TIR de policier pourrait être considéré légal.
Cette loi est d’une telle gravité, qu’il faut rétablir des faits. Voici 5 intox identifiées, on y répond.👇
TOUT TIR de policier pourrait être considéré légal.
Cette loi est d’une telle gravité, qu’il faut rétablir des faits. Voici 5 intox identifiées, on y répond.👇
Quelle sera la prochaine étape vers le transhumanisme assumé ?
Quelle sera la prochaine étape vers le transhumanisme assumé ?
fr.wikipedia.org/wiki/Liste_d...
fr.wikipedia.org/wiki/Liste_d...
My brother in Cthulhu, even ignoring everything else, LLMs are destroying a generation of students, and it’s literally one of their major selling points. Just do your fucking job.
My brother in Cthulhu, even ignoring everything else, LLMs are destroying a generation of students, and it’s literally one of their major selling points. Just do your fucking job.
Main Link | Techmeme Permalink
Those 100 data centers consumer 23% of all electricity used in Oregon.
Meanwhile, electricity rates skyrocket as more centers are built.
Those 100 data centers consumer 23% of all electricity used in Oregon.
Meanwhile, electricity rates skyrocket as more centers are built.
In case you wondered.
In case you wondered.
At the time, we were in the 5th COVlD wave. We're now in the 13th.
At the time, we were in the 5th COVlD wave. We're now in the 13th.