1: Sepulveda line
2: Transbay Tube 2.0
3: LOSSAN tunnel
4: Geary subway
5: CAHSR
6: K line North
7: Metro-link electrification
8: San Diego Purple Line
9: Vermont Subway
codeberg.org/aniva/BikeTag
codeberg.org/aniva/BikeTag
Convince boomer homeowners to care about transit (challenge level: impossible)
Convince boomer homeowners to care about transit (challenge level: impossible)
sfist.com/2026/11/13/c...
sfist.com/2026/11/13/c...
Caltrain nor Capital Corridor serve the SJ to east bay market all that well. Even if capital corridor became half hourly that’s still not good enough
Caltrain nor Capital Corridor serve the SJ to east bay market all that well. Even if capital corridor became half hourly that’s still not good enough
(Please see alt field for more detail)
#trains #railroads #railroading #unionpacific #trainspotting #sanjoseca #caltrain #transit
(Please see alt field for more detail)
#trains #railroads #railroading #unionpacific #trainspotting #sanjoseca #caltrain #transit
• Total duration is roughly 11h 25m to 11h 30m.
• Total duration is roughly 11h 25m to 11h 30m.