#ELCC
ELCC Rock by Nathan Iyer is a S-tier use of LLMs

youtu.be/SqLzt8R-KlU
ELCC Rock
YouTube video by Dashboard American
youtu.be
November 22, 2026 at 4:54 PM
catchiest ear worm since Conjunction Junction?

[rating system: electricity system geek warning]
ELCC Rock
youtu.be
November 25, 2026 at 9:51 AM
Hilarious video for all you energy nerds

youtu.be/SqLzt8R-KlU?...
ELCC Rock
YouTube video by Dashboard American
youtu.be
November 21, 2026 at 7:04 PM
Interesting story on ELCC and how Georgia Power (a subsidiary of Southern Company) calculates it:
insideclimatenews.org/news/1411202...
An Obscure Utility Calculation Is Putting a Thumb on the Scale for Gas in Georgia - Inside Climate News
As Georgia Power decides on its next generation of grid suppliers, a little-known piece of math may be giving the edge to fossil fuel projects.
insideclimatenews.org
November 22, 2026 at 11:10 PM
Ok, niche dork post but I’ve already watched this a couple times today. youtu.be/SqLzt8R-KlU?...
ELCC Rock
YouTube video by Dashboard American
youtu.be
November 20, 2026 at 8:58 PM
Work in the early learning and child care sector in Ontario?

There’s one day left to have your say in the Knowing Our Numbers 2 survey.

Tell us what’s working and what needs to change.

Closes tomorrow, Friday, Nov. 20, at midnight.

EN lnkd.in/gGPr4S8g
FR lnkd.in/gcJYs5sy

#ECE #ELCC #Workforce
November 19, 2026 at 1:19 PM
Not sure if you saw my earlier answer, but Lazard’s 2026 LCOE for new solar and existing nuclear have similar cost ranges. On an ELCC basis, I’m sure existing nuclear does cost less due to higher dispatchability.
November 12, 2026 at 5:15 PM
Xcel Energy’s cutting-edge Integrated Volt-Var Optimization (IVVO) is not just about saving energy; it’s also sparking a debate over capacity accreditation and operational limits.

Learn more here!

#CO #CitizenPortal #GridOptimization #EmergencyResponse #LoadReduction
Company describes IVVO program: 50 MW persistent reduction, 25 MW dispatchable emergency lever; ELCC treatment unclear
Company witnesses said Advanced Grid IVVO runs on roughly 450 feeders and provides about 50 MW of persistent load reduction and an additional 25 MW dispatchable emergency reduction; record shows confusion over whether an ELCC accreditation was applied in modeling and commissioners asked for clarification and backup workpapers.
citizenportal.ai
November 7, 2026 at 5:40 AM
Not sure about the rates in Ontario but Manitoba has a wage grid. Can't say where we are nationally on wages but they're doing something to ensure target wages are being met. And they've fully implemented $10 day daycare. The NDP are doing a great job for our province.
November 5, 2026 at 7:43 PM
Early Years Assistant (Permanent) (Term-Time, Part-Time) (Linnvale ELCC)
Early Years Assistant (Permanent) (Term-Time, Part-Time) (Linnvale ELCC)
£25,767.59 - £27,373.50 per year; Closing date: 15/11/2026
myjob.scot
October 30, 2026 at 1:03 PM
The heated debate over whether a clean-transition tariff or custom contracts will best serve Colorado's energy future has left industry experts and commissioners divided on critical resource adequacy modeling and emissions standards.

Get the details!

#CO #CitizenPortal #ResourceAdequacy
Commissioners, interveners debate clean-transition tariff, custom-contract pathway and nonfirm service
Witnesses debated whether CTT resources should be 100% clean and whether the custom-contract pathway (now advanced in rebuttal) adequately captures portfolio effects and emissions tests; parties pressed on firm vs nonfirm design, ELCC treatment of flexible resources, and how to count curtailed or nonfirm energy in recap modeling.
citizenportal.ai
October 30, 2026 at 1:28 AM
The heated debate over whether a clean-transition tariff or custom contracts will best serve Colorado's energy future has left industry experts and commissioners divided on critical resource adequacy modeling and emissions standards.

Get the details!

#CO #CitizenPortal #ResourceAdequacy
Commissioners, interveners debate clean-transition tariff, custom-contract pathway and nonfirm service
Witnesses debated whether CTT resources should be 100% clean and whether the custom-contract pathway (now advanced in rebuttal) adequately captures portfolio effects and emissions tests; parties pressed on firm vs nonfirm design, ELCC treatment of flexible resources, and how to count curtailed or nonfirm energy in recap modeling.
citizenportal.ai
October 30, 2026 at 1:28 AM
October 22, 2026 at 10:40 AM
On the operations side I think that makes sense. On the planning side I think it's probably fine, just the more override happens the lower your ELCC ends up being.
October 22, 2026 at 2:30 PM
$FCEL Latest company news, Oct 21, 2026: the Block System received a unit-specific ELCC rating of 99.873% for PJM's 2028/29 Reliability Backstop Procurement, roughly 99.9 MW of accredited capacity per 100 MW installed.

https://www.merlintrader.com/fuelcell-energy-stock-hub/
FuelCell Energy ($FCEL) Stock Hub: Cash, Fit, Production
FuelCell Energy Stock Hub: cash, monthly burn, Fit orders, production targets, debt and dilution, with dated catalysts and full bull and bear cases.
www.merlintrader.com
October 22, 2026 at 4:44 PM
PJM: solar made up 37% of applied capacity in the last transition cycle. In Cycle 1, that share fell to 6%. Gas now leads at 81 GW, with storage close behind on project count. The driver is capacity accreditation: gas and storage carry higher ELCC ratings, worth more with prices at the cap.
October 21, 2026 at 8:09 AM
“Every new parent is warned that as soon as you get pregnant, you need to sign up on the city’s daycare waitlist.”

Ottawa families are struggling to find child care amid long waitlists, limited spaces and unpredictable costs.

Read more: capitalcurrent.ca/ottawa-famil...
Ottawa families struggle to find child care amid daycare waitlists, unpredictable costs - Capital Current
Ottawa families face long daycare waitlists and rising demand as Ontario works to expand affordable child-care spaces under the ELCC program.
capitalcurrent.ca
October 20, 2026 at 6:01 PM
For 30 years, the MNO E&T Branch has supported Métis learners & families at every stage of life — including the earliest years. ELCC supports include child care subsidies, extra-curricular funding, learning kits, and more.

Read more: ow.ly/hlCS50ZX8tv
October 14, 2026 at 6:20 PM
We quantified the economic & fiscal gains from expanded early learning & child care in BC, as part of the national CWELCC plan: centreforfuturework.ca/2025/06/24/t.... 8K new ELCC jobs, 33K FTEs new female labour supply, $6b/yr more provincial GDP, $1b/yr new provincial govt revenue. #bcpoli /2
October 14, 2026 at 12:28 AM
The report noted that more commitment by both the fed & prov governments to the CWELCC's continued roll-out was necessary to ensure these benefits are fully reaped. The real ELCC issue in the current BC election should be which parties will commit to growing the program & meeting CWELCC targets?
October 14, 2026 at 12:28 AM
1. Gas peakers vastly outcompete batteries after a few hundred MWs of batteries due to rapidly declining ELCC. Several Canadian utility studies clearly demonstrate this effect. Should utilities proceed with those initial batteries? For sure, but (luckily) utilities are not shuttering their peakers.
October 11, 2026 at 6:04 PM
Woodworking can help children build creativity, confidence, problem-solving skills through hands-on learning. Join the MNO ELCC team on Oct. 28 from 6:30 to 8 p.m. EST to explore safe, practical woodworking in early learning settings.

Register: ow.ly/qE7350ZBvx1
October 5, 2026 at 6:11 PM
Maryland commission staff reveals crucial insights on resource adequacy, urging targeted procurement to balance costs and reliability—are we ready to rethink our energy strategy?

Click to read more!

#MD #CitizenPortal #ResourceAdequacy #CapacityPlanning #MarylandProcurement #EnergyEfficiency
PSC staff urges targeted, bounded procurements; highlights ELCC trade‑offs
Commission staff recommended any RECA procurement be discrete and directed (with capacity targets, timelines and project‑readiness thresholds) rather than open‑ended, and emphasized ELCC differences mean cheaper nameplate resources can require greater total spend to deliver accredited capacity.
citizenportal.ai
October 3, 2026 at 11:00 PM
PJM's capacity prices skyrocketed from $29 to $270 per megawatt day in just one year, forcing utility companies to rethink their strategies—find out how this volatility is reshaping the energy landscape!

Click to read more!

#WV #CitizenPortal #UtilityPlanning #WestVirginiaUtilities
PJM capacity market spike in 2025 upended planning, expert tells authority
Dave Ellis briefed the authority on PJM capacity-market history and volatility, saying prices jumped from roughly $29 per megawatt‑day to $270 in 2025 and stressing how the market structure (FRR vs RPM), ELCC ratings and performance factors change the value of generation for West Virginia utilities.
citizenportal.ai
October 4, 2026 at 1:03 AM