The plan was very recently approved by An Coimisiún Pleanála, and to suggest that the design can be radically changed now, with no further delay, is just pie in the sky.
1/4
The plan was very recently approved by An Coimisiún Pleanála, and to suggest that the design can be radically changed now, with no further delay, is just pie in the sky.
This was literally the policy position endorsed by the National Transport Authority in the 2016 #GalwayTransportStrategy in order to justify their support for the proposed #GalwayCityRingRoad.
'Bike lanes delay traffic, so we need major road expansion first.'
ALL ROAD USERS.
And painted bike-lanes? No safety improvement at all.
For sharrows, it’s actually safer to NOT have them.
Via @usa.streetsblog.org @nyc.streetsblog.org
This was literally the policy position endorsed by the National Transport Authority in the 2016 #GalwayTransportStrategy in order to justify their support for the proposed #GalwayCityRingRoad.
'Bike lanes delay traffic, so we need major road expansion first.'
1. If the misbegotten #GalwayCityRingRoad is built, the final cost will be at least €2 billion.
2. As soon as the N6GCRR is opened, the total number of car trips will increase, sprawl will grow and congestion will gradually return within a decade or so.
No problem at all!
1. If the misbegotten #GalwayCityRingRoad is built, the final cost will be at least €2 billion.
2. As soon as the N6GCRR is opened, the total number of car trips will increase, sprawl will grow and congestion will gradually return within a decade or so.
Developers and speculators have been lobbying for a "bypass" since the late 1990s.
It's payback time now.
Developers and speculators have been lobbying for a "bypass" since the late 1990s.
It's payback time now.
mikehynes.ie/blog/2026/05...
Quite the opposite, in fact.
Since motor traffic is like a gas and expands to fill all available space, the provision of a ring road alone will not magically create these conditions. Hence scepticism amongst informed observers about Galway Ring Road merits.
#BackToTheDrawingBoard
But it’s worth emphasizing bike lanes alone do not make a network. In the Netherlands up to two thirds of the network is in mixed, low-traffic conditions, where the bike is the dominant mode.”
bit.ly/4fskIGm
Quite the opposite, in fact.
Hopeless. Pitiful. Farcical.
www.galwaybayfm.ie/galway-bay-f...
Hopeless. Pitiful. Farcical.
www.galwaybayfm.ie/galway-bay-f...
One of the daftest notions about the #GalwayCityRingRoad is that, by making it much easier to cross the city by car, commuters will suddenly realise that driving is not so great after all.
It has happened nowhere else, but Galway will be so totally different. 🙄
We should not be bolting these on later at greater cost and disruption.
One of the daftest notions about the #GalwayCityRingRoad is that, by making it much easier to cross the city by car, commuters will suddenly realise that driving is not so great after all.
It has happened nowhere else, but Galway will be so totally different. 🙄
www.thejournal.ie/jack-chamber...
www.thejournal.ie/jack-chamber...
Everyone will travel by bus, bike and Shank's Pony to every event everywhere, all the time.
That includes every #GAA match to be played in Pearse Stadium.
Everyone will travel by bus, bike and Shank's Pony to every event everywhere, all the time.
That includes every #GAA match to be played in Pearse Stadium.
However, is there not a fundamental flaw in ACP's approval process?
The NTA "paused" the GTS, and said that it was to be superseded by a new plan.
However, is there not a fundamental flaw in ACP's approval process?
The NTA "paused" the GTS, and said that it was to be superseded by a new plan.
Unless he insists he meant it literally: that the Metrolink project would not result in tje construction of a children's hospital.
~An Coimisiún Pleanála, 2026.
~An Coimisiún Pleanála, 2026.
#InducedTraffic
#GalwayCityRingRoad
www.connachttribune.ie/news/traffic...
#InducedTraffic
#GalwayCityRingRoad
www.connachttribune.ie/news/traffic...
Many people still refer to the project as a "bypass" since it was first mooted in the late 90s, just over a decade after the first ring road was built.
The gist of their argument: we want a bypass, but build it somewhere else.
Many people still refer to the project as a "bypass" since it was first mooted in the late 90s, just over a decade after the first ring road was built.
The gist of their argument: we want a bypass, but build it somewhere else.
Note: revised projections presented at the N6GCRR oral hearing showed that the scheme would increase CO2 by 49% versus the Do Nothing option.
Note: revised projections presented at the N6GCRR oral hearing showed that the scheme would increase CO2 by 49% versus the Do Nothing option.
platforming pro-road propaganda at every available opportunity. 👇
www.advertiser.ie/galway/artic...
platforming pro-road propaganda at every available opportunity. 👇
www.advertiser.ie/galway/artic...
m.independent.ie/regionals/ga...
m.independent.ie/regionals/ga...