#MultimodalAccess
The final workshop for the Routes 303 and 304 planning study revealed crucial safety measures aimed at reducing traffic fatalities—your feedback could shape the future of these roads!

Get the details

#ClarkstownRocklandCounty #NY #MultimodalAccess #TrafficSafety #CitizenPortal
Clarkstown holds final workshop on Routes 303 and 304 safety and design study
At a June public workshop, consultants presented planning-level options for Routes 303 and 304 focused on safety and sustainability — including roundabouts, medians, sidewalks and a proposed trail — and urged public feedback before the study advances to funding and design phases.
citizenportal.ai
June 26, 2026 at 5:59 AM
Hillsborough TPO has taken a significant step toward enhancing Tampa's connectivity with a new Brightline station-area study, but crucial decisions on location and funding still lie ahead.

Read the full story

#HillsboroughCounty #FL #MultimodalAccess #UrbanConnectivity #TransportationPlanning
Hillsborough TPO accepts Brightline station‑area study, stops short of selecting a site
The Hillsborough County TPO voted unanimously Dec. 10 to accept a Brightline station‑area study that maps multimodal access needs around a potential Tampa station; the study focused on connectivity and did not recommend a station location or estimate construction costs.
citizenportal.ai
December 12, 2025 at 1:35 PM
A bold vision for US 77 is on the horizon, promising safer, more accessible streets for pedestrians, bikers, and transit users starting as early as 2028!

Click to read more!

#RobinsonMcLennanCounty #TX #CitizenPortal #RobinsonCompleteStreets #UrbanPlanning #MultimodalAccess #TransportationSafety
MPO consultants outline Complete Streets vision for US 77 corridor, say phased work could begin in 2028
Consultants and regional MPO staff presented access-management and Complete Streets guidelines for US 77 through Robinson and neighboring jurisdictions, emphasizing safety, multimodal corridors and a 2028–2030 horizon for some builds.
citizenportal.ai
September 16, 2026 at 6:22 AM
The McCart Corridor study is set to revolutionize transportation safety and smart technology in Fort Worth—could this be the future of city travel?

Get the details!

#FortWorthTarrantCounty #TX #CitizenPortal #FortWorthTransportation #SmartInfrastructure #PublicSafety #MultimodalAccess
City unveils McCart Corridor study with safety and smart‑technology priorities
City staff presented a 10‑mile McCart Avenue transportation technology corridor study that prioritizes safety, multimodal access and smart infrastructure; the public comment period is open Sept. 1–25, with CPC hearing Oct. 8 and council adoption slated for Oct. 27.
citizenportal.ai
September 16, 2026 at 5:20 AM
Crescent City is taking a bold step towards a safer and more accessible Highway 101 with a new multimodal plan, aiming to transform the corridor for all commuters!

Click to read more!

#CrescentCityDelNorteCounty #CA #MultimodalAccess #CitizenPortal #RoadSafety #CrescentCityTransport
Council backs two Caltrans planning grants for 101 and Northcrest corridors
Council authorized submission of a partnering Caltrans sustainable transportation planning grant (~$600,000) for the Redwood Highway (Highway 101) multimodal plan and approved a letter of support for a Northcrest Corridor planning application through the Del Norte Local Transportation Commission.
citizenportal.ai
September 12, 2026 at 6:50 PM
Exciting changes are coming to the County Line Bridge as it gets a major makeover for safer travel and enhanced access this fall!

Learn more here!

#MartinCounty #FL #MultimodalAccess #CitizenPortal #PublicSafety #InfrastructureDevelopment #MartinCountyBridge
County Line Bridge to be realigned, contract awarded for fall start
Hosts said the County Line Bridge (built in the early 1970s) will be realigned to straighten a hazardous curve, include a multimodal pathway, and is funded in part by state and federal grants; contract has been awarded and work is scheduled to begin this fall.
citizenportal.ai
September 11, 2026 at 3:03 PM
Redmond's ambitious transportation plan is set to enhance safety and connectivity for pedestrians and cyclists, paving the way for a more accessible future.

Learn more here!

#RedmondKingCounty #WA #EquityConnectivity #RedmondTransportation #MultimodalAccess #CitizenPortal
Council reviews bike-ped spine and pavement priorities; staff aim to close connectivity gaps
Public-works staff previewed multimodal transportation projects that form a bicycle spine (NE 40th shared-use path, Bell-Red improvements, WLSP multimodal phase 2, and a cycle track) and noted the system size: ~366 lane miles, 233 sidewalk miles, and ~80.5 miles of bike facilities.
citizenportal.ai
September 11, 2026 at 12:11 PM
The first phase of the Transportation Master Plan reveals critical insights on multimodal access and future growth, setting the stage for a safer, more connected community.

Click to read more!

#CO #MultimodalAccess #InfrastructurePlanning #CitizenPortal #PublicEngagement
Town gets first‑phase transportation master plan: focus on multimodal corridors, seasonal peaks and project prioritization
KLJ Engineering presented phase‑one of the Transportation Master Plan: existing conditions, public engagement results (West Main, US‑24 priorities), crash data, and draft goals emphasizing multimodal access, seasonal planning and attainable projects; staff will prepare prioritized project lists and cost estimates next.
citizenportal.ai
August 29, 2026 at 2:43 AM
Nampa is gearing up for a transformative 1.7-mile widening of Eustic Road, turning it from a quiet two-lane into a bustling five-lane corridor with improved safety features and multimodal pathways!

Click to read more!

#NampaCanyonCounty #ID #MultimodalAccess #TrafficSafety #NampaTransportation
Nampa outlines Eustic Road widening, new intersections and multiuse paths
Transportation staff said the Eustic Corridor project will widen about 1.7 miles of Eustic Road to a five‑lane urban section with median, concrete intersections, new traffic signal and protected U‑turn designs (RCUT/ARCT), multiuse pathways and improved utilities; completion is projected in July 2027.
citizenportal.ai
August 5, 2026 at 3:26 AM
The William Hilton Parkway master plan is set to transform our gateway into a safer and more accessible corridor, with exciting proposals like pedestrian bridges and a dedicated Gullah Geechee Heritage Park!

Learn more here!

#HiltonHeadIslandBeaufortCounty #SC #MultimodalAccess #TrafficSafety
Hilton Head workshop advances William Hilton Parkway master plan, seeks funding path
Town staff and consultants presented a feasibility-level William Hilton Parkway master plan focused on safety and multimodal access, proposing a phased $126 million build-out (2025 dollars) that includes a continuous "green T," dual-left improvements, pedestrian bridges and a proposed Gullah Geechee Heritage Park; council expressed support to advance a resolution pending coordination with Beaufort County and SCDOT.
citizenportal.ai
July 29, 2026 at 8:40 AM
A new long-term plan for the Duff Avenue Corridor aims to enhance safety and multimodal access, addressing urgent concerns like frequent train delays and traffic crashes.

Click to read more!

#AmesCityStoryCounty #IA #MultimodalAccess #CitizenPortal #AmesCity #UrbanPlanning #TransportationSafety
Ames City workshop previews Duff Avenue corridor plan; staff highlights safety gains and rail crossing study
At a July 21 workshop, staff presented a Duff Avenue Corridor study recommending long‑term multimodal upgrades — including a potential conversion from four lanes to a three‑lane cross section, an 8‑ft shared use path and upgraded pedestrian crossings — while also recommending a separate railroad‑crossing study to address frequent train delays.
citizenportal.ai
July 22, 2026 at 3:45 PM
Big changes are coming to Indian River Shores with major transportation projects that promise to revolutionize local mobility and safety!

Click to read more!

#FL #CitizenPortal #IndianRiverShoresInfrastructure #TransportationImprovements #CommunitySafety #MultimodalAccess
Vice Mayor summarizes critical MPO projects including Sebastian Inlet bridge upgrades
Vice Mayor outlines key priorities and funding for upcoming roadway and bridge projects.
citizenportal.ai
June 27, 2025 at 9:37 PM
Tumwater has officially adopted a bold six-year Transportation Improvement Program, unlocking new funding opportunities for vital projects like the East Street Connection and a new roundabout at 93rd Avenue & Case!

Learn more here

#TumwaterThurstonCounty #WA #MultimodalAccess #CitizenPortal
Council adopts six‑year transportation improvement program for 2027–2032
Tumwater adopted Resolution R2026‑009, its six‑year Transportation Improvement Program (TIP) covering 2027–2032; the TIP lists capacity, multimodal and preservation projects and is required by state law for grant eligibility.
citizenportal.ai
June 6, 2026 at 11:46 AM
Woodland is paving the way for a safer, more connected future with ambitious transportation improvements that prioritize biking, walking, and public transit.

Learn more here!

#WoodlandCowlitzCounty #WA #ActiveTransportation #CitizenPortal #WoodlandTransportation #MultimodalAccess
Woodland plans multimodal transportation improvements with new comprehensive safety guidelines
Woodland integrates multimodal designs in transportation plans to enhance roadway safety and connectivity.
citizenportal.ai
May 17, 2025 at 11:44 AM
Benton Harbor is gearing up for a transformative multi-year reconstruction of M-139/Fair Avenue, featuring a roundabout, bike lanes, and significant utility upgrades starting in 2026!

Get the details!

#BentonHarborBerrienCounty #MI #MultimodalAccess #BentonHarborPublicWorks #PublicSafety
MDOT previews multi‑year M‑139/Fair Avenue rebuild for Benton Harbor; roundabout, bike lanes and utility work planned
MDOT officials gave a detailed preview of a multi‑year, multi‑phase reconstruction of M‑139/Fair Avenue (about 4.5 miles) with bids advertised, an estimated construction start in April 2026, a roundabout at Empire Avenue, conversion of MLK and Fair Avenue to two‑way traffic, bike lanes on Fair Avenue, and significant utility and drainage work.
citizenportal.ai
December 17, 2025 at 2:55 AM
Muskegon is inviting you to share your voice in shaping the future of our trails and waterways—your input matters!

Get the details

#MuskegonCityMuskegonCounty #MI #CitizenPortal #MultimodalAccess #EnvironmentalStewardship #CommunityEngagement #MuskegonCity
Muskegon schedules public meetings for multimodal access and waterfront improvement
Muskegon announces upcoming meetings for community input on trails and waterways access.
citizenportal.ai
March 31, 2025 at 6:34 PM
Morrisville's new transportation plan promises safer roads and 146 innovative projects aimed at enhancing connectivity and securing crucial funding for the town's future.

Learn more here!

#NC #CommunityEngagement #MultimodalAccess #CitizenPortal #PublicSafety #MorrisvilleTransportation
Morrisville presents draft transportation plan with new cross sections, 146 project concepts and tighter prioritization
Town staff and Kimley Horn consultants presented a draft comprehensive transportation plan update that narrows cross‑section flexibility, prioritizes 146 multimodal projects and introduces a local connectivity metric intended to improve access and position projects for CAMPO/NCDOT funding.
citizenportal.ai
April 17, 2026 at 5:56 PM
San Francisco is embarking on a transformative $13.5 billion Embarcadero Connectivity Plan aimed at revolutionizing waterfront transportation for generations to come!

Click to read more!

#SanFranciscoCitySanFranciscoCounty #CA #MultimodalAccess #SanFranciscoTransportation #WaterfrontResilience
SFMTA and Port launch Embarcadero Connectivity Plan; Port study estimates $13.5 billion in potential resilience costs
SFMTA introduced a two‑year Embarcadero Connectivity Plan to coordinate multimodal transportation with the Port's waterfront resilience work. The Port cited a USACE feasibility study with a preliminary $13.5 billion estimate and noted federal authorization could cover up to 65% of costs.
citizenportal.ai
January 22, 2026 at 8:35 AM
Capitola's City Council is taking action to enhance safety and access on the bustling 41st Avenue corridor, responding to community concerns and a vision for a vibrant, multimodal future!

Learn more here

#CapitolaCitySantaCruzCounty #CA #CitizenPortal #MultimodalAccess #CommunitySafety
Capitola council backs widening 41st Avenue study to include Claire Street, mall coordination
Council heard a consultant update on the 41st Avenue corridor on Nov. 13 and directed staff to expand the study area to include Claire Street and parts of Capitola Road, coordinate with the mall project and consider a budget amendment to cover the additional scope.
citizenportal.ai
November 15, 2025 at 10:47 AM
Worcester County is gearing up for a transformative transportation strategy aimed at enhancing connectivity while preserving its picturesque rural charm.

Click to read more!

#WorcesterCounty #MD #RuralConnectivity #InfrastructurePlanning #WorcesterCountyTransportation #MultimodalAccess
Worcester County plans comprehensive transportation strategy to improve infrastructure connectivity
Worcester County develops transportation plan focusing on connectivity and infrastructure enhancements.
citizenportal.ai
February 14, 2025 at 12:43 PM
UDOT has unveiled exciting new project recommendations and a revamped financial model aimed at transforming Utah's transportation landscape by 2027!

Click to read more!

#UT #MultimodalAccess #CitizenPortal #EconomicOpportunity #QualityOfLife
UDOT details programming workshops and Unified Plan adds new statewide financial model
UDOT reported recommendations from March and May programming workshops (project and program buckets for the STIP) and said some projects are programmed into 2031; MAG and UDOT presented a refreshed Unified Transportation Plan financial model and invited JPAC feedback on communications priorities.
citizenportal.ai
June 14, 2026 at 12:49 PM