#TRISO
"Nuclear fuel company Standard Nuclear has submitted the Documented Safety Analyses for two new identical TRISO fuel production facilities in Tennessee and Idaho to the US Department of Energy for review."

#nuclear #news

www.world-nuclear-news.org/articles/key…
Key step in licensing of US TRISO fuel facilities
Nuclear fuel company Standard Nuclear has submitted the Documented Safety Analyses for two new identical TRISO fuel production facilities in Tennessee and Idaho to the US Department of Energy for review.  ;
www.world-nuclear-news.org
November 25, 2026 at 11:01 AM
Nuclear fuel company Standard Nuclear has submitted the Documented Safety Analyses for two new identical TRISO fuel production facilities in Tennessee and Idaho to the US Department of Energy for review.
www.world-nuclear-news.org/articles/key...
Key step in licensing of US TRISO fuel facilities
Nuclear fuel company Standard Nuclear has submitted the Documented Safety Analyses for two new identical TRISO fuel production facilities in Tennessee and Idaho to the US Department of Energy for...
www.world-nuclear-news.org
November 24, 2026 at 5:56 PM
🚨 JUST IN: $STDN
Standard Nuclear files final safety analyses with DOE for SN-TN and SN-ID TRISO fuel plants

#SEC #stocks #investing #STDN #Regulatory
🔗 secwatch.observer
November 23, 2026 at 3:19 PM
Job ID: UFV-PA 2026/3675
Extract: PhD project developing nuclear safeguards methods for advanced reactors, focusing on TRISO-fuelled systems and maritime applications. Combines reactor physics, fuel modelling, radiation detection, and data analysis.
November 26, 2026 at 5:43 PM
A filed safety analysis is not an approved one. DOE still has to review both Standard Nuclear plants, and an Operational Readiness Review comes after that. Each plant is designed to scale to 2.5 MTU a year. #nuclear
Standard Nuclear Files Final DOE Safety Analyses for 2 TRISO Fuel Plants
Standard Nuclear said on Nov. 23 it filed final safety analyses for its Tennessee and Idaho TRISO plants. DOE review is pending, and the company targets authorization in February 2027.
voltgridnews.com
November 26, 2026 at 3:13 PM
Liu Cixin's Trisolarans could never predict their three suns. Now you can try. Claude Code and I built a little sky for the welcome page of Unlawful Laws: nudge one sun and watch everything change, for good.
dan-li-o.github.io/3body/#triso...
Unlawful Laws
How to Live with Scientific Uncertainties
dan-li-o.github.io
November 21, 2026 at 5:30 PM
South Korea's Samsung Heavy signs up a US reactor maker for the first nuclear-powered LNG carrier #SamsungHeavy #NuclearEnergy #LNGCarrier #SouthKorea #EnergyInnovation
South Korea's Samsung Heavy signs up a US reactor maker for the first
IntelliNews summary: • Tesser's Triton reactor runs on TRISO fuel with low-pressure molten salt coolant and can take on fuel while operating. • Samsung Heavy won ABS approval in principle in 2025 for a 174,000 cubic metre carrier with a 100MWt KAERI-designed reactor. • The 234 LNG carriers due in 2026-2030 could carry 158mn t/yr at most, against 229mn t/yr of sanctioned export capacity. • The IMO is scheduled to resume its adjourned Net-Zero Framework session on December 4. ____________________ South Korea's Samsung Heavy Industries (KRX:010140) has paired exclusively with Texas-based Tesser Atomics to develop a nuclear-powered liquefied natural gas (LNG) carrier for the transatlantic trade. Under a memorandum of understanding signed in Norway on November 19, the Korean yard becomes Tesser's sole shipbuilding partner and Tesser the yard's sole reactor partner for a demonstration vessel, the two companies said in a joint announcement. Samsung Heavy takes the hull: design, systems integration and construction. Tesser brings the reactor and is responsible for getting it licensed. They describe a path from concept checks to a demonstrator and then repeat orders, with the first ship expected to trade commercially between the US and Europe. Reactors at sea have so far driven warships and Russia's Arctic icebreakers, and almost nothing that earns its living hauling freight. Whether a gas tanker becomes the first commercial exception will be decided by flag states, class societies, insurers and ports. On that reckoning the licensing half of this deal may matter more than the steel. Fuel while you sail Tesser's design, called Triton, is a compact fluoride-salt-cooled high-temperature reactor (FHR). It runs on TRISO fuel, carries its heat away in molten salt at low pressure and can be refuelled while operating. Per Peterson, Tesser's co-founder and chief executive, also co-founded Kairos Power, which is keeping its version of the technology for grid electricity while Tesser takes it to sea. "Our reactors use TRISO, a proven fuel the U.S. Department of Energy spent more than two decades developing. They refuel while they run, so owners can choose when they want to buy new fuel," Peterson said. The tie-up has Norwegian parentage. It began in NuProShip, a research programme that screened reactor types for merchant ships, and continues inside SFI SAINT, a consortium led by the Department of Ocean Operations and Civil Engineering at the Norwegian University of Science and Technology (NTNU) and backed by the Research Council of Norway. Kyunghee Kim, who heads Samsung Heavy's Future Business Division, set out the commercial test: "we aim to prove that a nuclear-powered merchant ship can be deployed on a commercial trade route and give shipowners the evidence they need to choose nuclear propulsion for their next generation of vessels." Third design, same cargo In September 2025 it won approval in principle from the American Bureau of Shipping (ABS) and the Liberian flag for a 174,000 cubic metre carrier driven by a molten salt reactor it had developed with the Korea Atomic Energy Research Institute (KAERI). That unit was rated at 100MWt and designed to last the ship's whole life without refuelling, World Nuclear News reported, quoting KAERI calling the approval "the first step toward moving forward with actual ship development". A year earlier ABS had modelled a high-temperature gas-cooled reactor on a 145,000 cubic metre carrier and found it would allow faster passages with no emissions, though the reactor would need replacing about every six years. A sealed core, a swap-out core and now a core topped up at will: three answers to the same question about who buys fuel and when. Owners raised on bunker markets are likely to find the last one the easiest to price. Why the Atlantic American cargoes made up 57% of Europe's LNG imports in 2025, and the Institute for Energy Economics and Financial Analysis (IEEFA) expects the US to supply two-thirds in 2026. Ships are short as well: the 234 newbuild carriers due between 2026 and 2030 could carry 158mn t/yr at most, against 229mn t/yr of export capacity that has reached a final investment decision. New LNG export capacity at FID against what the 2026-2030 newbuilds could carry, mn t/yr. Source: IMO data, Argus Media. IntelliNews For a Korean yard the timing fits a wider hunt for business beyond standard hulls. Samsung Heavy appears to be furthest ahead in floating data centres, and Seoul has earmarked $150bn for shipbuilding co-operation with Washington within its $350bn US investment pledge. A US reactor in a Korean hull carrying US gas sits neatly inside that bargain. Waiting on the rulebook Shipping produced 1,056mn tonnes of CO2 in 2018, 2.89% of the global total, according to the Fourth IMO GHG Study. In July 2023 the International Maritime Organization (IMO) set a goal of net-zero emissions by or around 2050, but the rules meant to deliver it have stalled. In October 2025 member states adjourned for a year the session called to adopt its Net-Zero Framework, leaving owners weighing fuels such as ammonia without the fuel standards and incentives that would favour them. The marine environment committee meets from November 30 to December 3 and is scheduled, subject to confirmation at that meeting, to reopen the session on December 4, with nine countries proposing an alternative to its financial penalties. Total shipping CO2 emissions, mn tonnes, 2012-2018. Source: Fourth IMO GHG Study 2020. IntelliNews The memorandum names no ship, date or budget, and neither company has given one. What it buys Samsung Heavy is first place in the queue if the regulators and the owners come round, and a working ship on the busiest LNG lane in the world would be harder for the IMO's negotiators to ignore than another study. This article was produced with the help of the IntelliNews Lambda analytical tool
dlvr.it
November 24, 2026 at 1:41 AM
SMRs approved in Texas
--- The TRISO-X pellet Image source From ZME Science > **The Nuclear Regulatory Commission this week issued a permit for construction of four next-generation nuclear reactors at a petrochemical complex on the rural Gulf Coast of Texas. > > The Long Mott Generating Station, developed by chemical giant Dow and nuclear startup X-energy, is one of two flagship projects selected by the U.S. Energy Department in 2020 for its Advanced Reactor Demonstration Program, intended to kickstart a new era of growth for the nation’s nascent nuclear sector. > > “This milestone marks a significant step forward,” Mike Goff, principal deputy assistant secretary for nuclear energy, said in a press release Monday. “The NRC’s approval demonstrates meaningful progress toward deploying advanced reactors.” > > The Texas project is at the leading edge of a new generation of reactor designs that could revolutionize the commercial model for atomic energy. They replace the gargantuan construction projects currently required for nuclear power plants with small, modular units that can be produced in factories and then shipped and assembled onsite at industrial installations, from data centers to petrochemical plants. > > “We understand that owning a nuclear facility is a different kind of responsibility,” said Kreshka Young, North American business director for energy and climate at Dow, during a public meeting on the project’s construction permits in the town of Port Lavaca in September. “We do not take that lightly.” > > Dow plans to install four 80-megawatt reactors by X-energy at its Seadrift Operations complex, on the Gulf Coast between Houston and Corpus Christi. The units won’t require the towering, concrete containment structures characteristic of existing nuclear reactors, nor the 10-mile emergency planning zone, thanks to what scientists describe as revolutionary safety features inherent in new reactor designs. > > X-energy CEO J. Clay Sell, a former deputy energy secretary, has described the company’s Xe-100 unit as “physically impossible to melt down.” > > Diane Wilson, a retired fourth-generation shrimper from the tiny nearby town of Seadrift and director of San Antonio Bay Waterkeeper, a local environmental organization, remains deeply skeptical. “Frankly, it’s outrageous,” she said. “This is outrageous.”** > **Spent fuel from the reactors will be stored indefinitely on-site as nuclear waste, she noted, as the U.S.still lacks a permanent national disposal site. > > In 2025, Wilson’s organization filed legal challenges to the project’s permit application over safety concerns, which were ultimately dismissed by the NRC. The agency approved Dow’s reactor construction permit after an expedited review under executive orders from President Donald Trump aimed at accelerating the national energy sector. > > “We delivered on the 18-month schedule, proving we can do rigorous safety reviews on predictable timelines that move advanced nuclear technology from design to construction,” said NRC Chairman Ho K. Nieh in a press release. > > Dow still needs to make a final decision to proceed with the project, the company said in a release. If it does, construction could begin before 2030.** > **If the project proves successful, it would “provide a pathway other industries can emulate” to install dedicated, onsite power generation, said Martin O’Neal, general counsel for the Nuclear Energy Institute, at the September meeting in Port Lavaca. > > The NRC hosted the meeting to take questions and comments from the public on the Long Mott Generating Station. > > “The nuclear industry is watching this project very closely,” O’Neal said. > > In the last three decades, the U.S. has built just one new nuclear power plant, but federal authorities have pushed in recent years for an industry revival based on new reactor designs. The NRC issued its first permit for construction of an advanced test reactor in 2023, and its first permit for an advanced commercial reactor in March 2026. > > While typical nuclear reactors use water to cool, advanced designs use alternatives, from molten salt to gas. The Xe-100 uses helium gas. Rather than traditional fuel rods, the Xe-100 uses a pelletized fuel form in a moving bed of pebbles. > > “These are new technologies,” said Mehdi Reisi Fard, deputy director of advanced reactors at the NRC, during the public meeting in Port Lavaca in September. > > The innovations add up to a feature known as “functional containment,” where the natural resilience and circulation of fuel pebbles prevents the kind of runaway warming that could lead the reactor to melt down. > > Compared with current control systems, functional containment is “less reliant on pumps or human intervention to mitigate anomalies,” Fard explained. > > It works thanks to a new kind of pelletized nuclear fuel, called TRISO fuel, which has been developed in Energy Department labs over decades. > > “Simply put, TRISO particles cannot melt in a commercial high-temperature reactor,” a DOE webpage says. > > The new technology enables developers to skip the big, expensive safety features, like the massive concrete casings, that are required for traditional water-cooled reactors. > > “The argument these developers are using is that they don’t need a physical containment because the reactor is so safe,” said Edwin Lyman, director of nuclear power safety with the Union of Concerned Scientists, in an interview earlier this year. “Nuclear designers have been trying to reduce the costs of containment, and one way to do that would be to eliminate it entirely.” > > But Lyman doesn’t consider the fuel to be as safe as authorities say. > > “It’s just a myth that this fuel is indestructible or meltdown-proof,” he said. “This fuel has vulnerabilities.”** From to X-energy's website: ### > ### Primary Loop (Reactor Core) > > 1. **_Nuclear fission occurs in TRISO fuel particles_ : Energy is produced inside poppy-seed-sized uranium kernels sealed within protective ceramic layers and embedded in graphite fuel pebbles. Each TRISO particle’s ceramic layers are designed to retain fission products at temperatures far exceeding any foreseeable operating or accident scenario, providing containment at the particle level.** > 2. **_Graphite absorbs heat and controls the reaction_ : The surrounding graphite, both in the pebbles and the core structure, slows neutrons to sustain a stable fission reaction and distributes heat evenly throughout the core. ** > 3. ** _Helium carries heat out of the core_ : Helium gas flows through the reactor, picking up heat from the graphite. Because helium is inert and remains a gas across the full operating temperature range, it’s able to transfer heat without boiling, reacting, or corroding equipment.** > > > ### Secondary Loop (Steam Generator) > > 4. **_Heat passes through the steam generator_ : Hot helium flows into a steam generator where thermal energy passes through metal tubing into a separate water loop. The helium and water systems remain physically isolated, so only heat crosses the boundary – not radiation.** > 5. **_Steam is used for power or industrial heat_ : The resulting steam can generate electricity through conventional turbines or be delivered directly to industrial facilities requiring high-temperature process heat—replacing fossil-fuel boilers without operational changes to existing manufacturing processes.** > 6. **_Automatic shutdown if temperatures rise_ : If something disrupts normal operation, the Xe‑100 is designed to shut down automatically. As fuel and graphite temperatures increase, the reactor experiences a strong negative temperature coefficient of reactivity. The resulting reduction in reactivity naturally decreases fission power until a new stable equilibrium is reached — without operator action or backup power. ** > This SMR can produce electricity, but its obvious use is for industrial processes requiring high heat. I remain skeptical about SMRs and the promises of the nuclear industry. It all sounds very convincing, but so did the old giant reactors, until actual operations revealed their problems. The problem of disposal of the nuclear waste remains. And, in the end, will these SMRs go ahead? We've seen so many promising SMR projects fail. This is to be expected from new technologies, so it will be fascinating to see if this one works. However, as Michael Liebreich says "we will need not dozens, or hundreds, but thousands of SMRs to make a difference". 4.
volewica.blogspot.com
November 24, 2026 at 6:05 AM
It'll almost certainly be pushed back more: original plans were full power testing in 2023.

But, they actually made (BWXT is shaping up to be a TRISO manufacturer too) and shipped the fuel already so that makes me believe they're actually on a real timeline and not just making up numbers anymore
November 20, 2026 at 12:48 AM
[some-subscribed-rss] New Post: SMRs approved in Texas, by Unknown https://volewica.blogspot.com/2026/11/smrs-approved-in-texas.html
November 23, 2026 at 12:08 PM
Designing the back end together with the reactor is the right order. TRISO, metallic and salt fuels each need their own route to a cask and a repository, and that is far cheaper to settle on paper than after the first core comes out
November 17, 2026 at 6:25 AM
DOE's ARDP covers about half of TX-1's cost, and Congress has appropriated about $1.1 billion of the $1.2 billion commitment, X-energy's 10-Q says. The NRC must still inspect the plant before TRISO-X can receive HALEU. #nuclear #energy
TRISO-X TX-1 Fuel Plant: Oak Ridge Factory for the First 11 Xe-100s
X-energy's TRISO-X TX-1 fuel plant is licensed but unfinished, with capacity projected for the first 11 Xe-100s. An NRC weld demonstration is due by Nov. 20; TX-1's cost and start date are undisclosed.
voltgridnews.com
November 16, 2026 at 7:13 PM
It's the dumbest possible thing by the worst nuclear energy company to exist lol. At least they are TRISO and small so they have limited potential for catastrophic failure I guess. It's a part of their "gigasite" model because they want to use small reactors but want large reactor outputs.
November 16, 2026 at 6:02 AM
TX-1 is meant to fuel up to 11 Xe-100 reactors, X-energy says. If the NRC rejects the weld case, every affected weld must be repaired, replaced or redesigned within six months; neither NRC document addresses TX-1's schedule. #nuclear #energy
TRISO-X Has 30 Days to Prove TX-1 Welds Under NRC Order, No Civil Penalty
The NRC's Oct. 21 confirmatory order, due in the Federal Register Nov. 17, binds TRISO-X to fix weld lapses at X-energy's TX-1 fuel plant. It carries no notice of violation and no civil penalty.
voltgridnews.com
November 16, 2026 at 3:13 PM
I feel relatively good about TRISO reactors because I watched (and compiled progress reports on) the UHTREX reactor at Los Alamos. And the TRISO fuel is more secure, although I don't know I'll ever feel 100% about that.

But I'd still like to know more about the containment.
November 12, 2026 at 1:30 AM
This was accepted as safe decades ago since the reactor just can’t do all that much and the TRISO acts as a fission fragment barrier. It’s very expensive, but it does work.
November 12, 2026 at 1:24 AM
Standard Nuclear backlog more than doubles to $577.2 million
Standard Nuclear backlog more than doubles to $577.2 million
The company also delivered Radiant’s Kaleidos core, the first complete TRISO-based reactor core supplied by an independent U.S. manufacturer.
signa.news
November 12, 2026 at 12:09 PM
I have seen him push actual, honest to goodness lies on nuclear safety and proliferation. I have zero respect for the man at this point, he is financially incentivized to make a panic.

The X energy designs are mostly public as far as I know. It’s TRISO fuel in a steel vessel with helium coolant.
November 12, 2026 at 1:24 AM
Didn't AIDEA just give NuCube $25 million, and create NuAlaska, to promote TRISO micro reactors specfically for remote Alaska locations? Seems a perfect fit here - 6 yrs for DC construction and 6 yrs until reactors commercially available. Or is this just another pipe(line) dream?
November 11, 2026 at 7:18 PM
These are TRISO based pebble bed high temperature gas reactors. This is the most mature US company pursuing a design with this fuel, and this is not about a relaxing of regulations.

Here's a nice piece on the safety science (from Mother Jones! in 2020.).

www.motherjones.com/environment/...
Nuclear "power balls" may make meltdowns a thing of the past.
This alien-looking fuel with built-in safety features will power a new generation of high-temperature reactors.
www.motherjones.com
November 12, 2026 at 1:06 PM
NuCube Energy just received $25 million from the State of Alaska and created NuAlaska to handle TRISO micro reactors in the state. Are HALEU fuel production bottlenecks being overcome, or will the US need to downblend its entire nuclear arsenal to feed the mania?
November 12, 2026 at 2:31 AM
Partly, but more because of the credit given to TRISO fuel for radionuclide retention, which has not been demonstrated for all accident conditions.
November 6, 2026 at 8:15 PM