youtu.be/PD7w75M25lw
youtu.be/PD7w75M25lw
A #character from Third Citizen of Dreams
amazon.com/author/spanoudis
Created with #MidjourneyAI #PSP and #Topaz
Originally from #Chennai #India
Senior Instructor at the SEAPAC Academy
Part of a rich #ensemble cast
#books #ai #aiart #scifi #adventure #sciencefiction
#midjourney
A #character from Third Citizen of Dreams
amazon.com/author/spanoudis
Created with #MidjourneyAI #PSP and #Topaz
Originally from #Chennai #India
Senior Instructor at the SEAPAC Academy
Part of a rich #ensemble cast
#books #ai #aiart #scifi #adventure #sciencefiction
#midjourney
District Hall: Shuttered 3 years.
MBTA Headhouse: Half-built war zone.
Seaport Common: Under construction 13 years.
Echelon: Plastic flowers.
Harbor Way: Plastic park.
SeaPAC and fake "endowment:" Status Unknown.
Athens of the East or Dedham Legacy Place 2.0?
District Hall: Shuttered 3 years.
MBTA Headhouse: Half-built war zone.
Seaport Common: Under construction 13 years.
Echelon: Plastic flowers.
Harbor Way: Plastic park.
SeaPAC and fake "endowment:" Status Unknown.
Athens of the East or Dedham Legacy Place 2.0?
In the new Congress, we’re going to have to do something about this Supreme Court, and let me be very clear: everything is on the table.
1) BPDA newly executed SeaPAC MOA
2) BPDA PRR packet re. obligations of BXP at BSA Space (Atlantic Wharf)
3) Status of $20m WS/MassDOT obligations (headhouse, crosswalks, cycle lanes, etc)
4) Two possible PRRs, one for all BPDA comms w/ FP hucksters.
And more.
1) BPDA newly executed SeaPAC MOA
2) BPDA PRR packet re. obligations of BXP at BSA Space (Atlantic Wharf)
3) Status of $20m WS/MassDOT obligations (headhouse, crosswalks, cycle lanes, etc)
4) Two possible PRRs, one for all BPDA comms w/ FP hucksters.
And more.
hearham.com/repeaters
hearham.com/repeaters
Is a plastic blob of grass a surprise? WS investors will profit handily.
Meanwhile on Fan Pier, Fallon Co invests in a multi-acre grassy park, including maintenance and enforcement of regs to keep it suitable for babies and picnics.
WS is all about the 💲
A value engineered plastic park is on brand.
Apparently they found some local support and gave the Seaport n’hood association two weeks notice.
Is a plastic blob of grass a surprise? WS investors will profit handily.
WS promised an $8.5m “endowment” for SeaPAC, but BPDA memorialized the $8.5m as a contribution that could be spent down by WS.
First, an 8-story commercial building was proposed ON Seaport Common. Then, months later, WS took victory laps for reducing it to 3 stories (and victory laps in 2022 for eliminating the 3).
First trumpeted in 2017 headlines as a residential project in a plan to add 700 housing units to Seaport Square, the zoning was then flipped to office/lab, eliminating the 700 housing units.
WS promised an $8.5m “endowment” for SeaPAC, but BPDA memorialized the $8.5m as a contribution that could be spent down by WS.
Finish Seaport Common, in construction for 13 years.
Open District Hall, shuttered for 3 years.
Don't mislead DEP re. civic space obligations.
Build free, public pickleball courts, not $100/court.
Open SeaPAC, you already marginalized it.
(1/30)
Finish Seaport Common, in construction for 13 years.
Open District Hall, shuttered for 3 years.
Don't mislead DEP re. civic space obligations.
Build free, public pickleball courts, not $100/court.
Open SeaPAC, you already marginalized it.
(1/30)
On 10/25/2025, BPDA executed a MEMORANDUM OF AGREEMENT RE: SEAPAC.
This MOA has been in the works for years, and Wu's BPDA gets props for trying to salvage commitments not memorialized by Walsh. One of my concerns? The fate of $8.5m sold to the public as an "endowment."
Stay tuned.
On 10/25/2025, BPDA executed a MEMORANDUM OF AGREEMENT RE: SEAPAC.
This MOA has been in the works for years, and Wu's BPDA gets props for trying to salvage commitments not memorialized by Walsh. One of my concerns? The fate of $8.5m sold to the public as an "endowment."
Stay tuned.
• Performing Arts Center (SeaPAC)
• $8.5m Cultural "Endowment"
• Community Theatre
• Block D (5,000sf)
• Mystery Retail Subsidy at L4
• District Hall (shuttered 3 years)
• Performing Arts Center (SeaPAC)
• $8.5m Cultural "Endowment"
• Community Theatre
• Block D (5,000sf)
• Mystery Retail Subsidy at L4
• District Hall (shuttered 3 years)
Where was the Chamber? AWOL
* Waterfront Cultural Center (401 Congress)
** SeaPAC
** Great Hall (Winthrop Center)
** NEW! Fan Pier Parcel H
*** Future of BSA Space
*** Gillette PDA
* quietly evaporated
** marginalized
*** on deck
Where was the Chamber? AWOL
* Waterfront Cultural Center (401 Congress)
** SeaPAC
** Great Hall (Winthrop Center)
** NEW! Fan Pier Parcel H
*** Future of BSA Space
*** Gillette PDA
* quietly evaporated
** marginalized
*** on deck
A Seaport Square master developer claimed they were in talks w/ Boston Ballet, aggregating cultural space into one 200,000 sf performing arts center. 🤔
That's just the early history of SeaPAC.
A Seaport Square master developer claimed they were in talks w/ Boston Ballet, aggregating cultural space into one 200,000 sf performing arts center. 🤔
That's just the early history of SeaPAC.
By: Luke on Thursday, May 29, 2025
By: Luke on Thursday, May 29, 2025