#wcml
Reminder that we are still hiring and that there are ten days left to apply to be the manager of the WCML.

For more information and how to apply: wcml.org.uk/news/wcml-li...
November 26, 2026 at 12:00 PM
On Wednesday I had the pleasure of touring the HS2 Curzon Street station site. After all the years of prep work, which went largely unnoticed, it was fantastic to see the rapid progress on the construction of the station's supporting structure. #HS2
November 27, 2026 at 10:10 AM
It's the belief of most rail experts that the major bottlenecks on WCML is throttling freight and local services and a new InterCity line, separate from WCML is the cheapest option

Personally, I would like to see HS2 as well as improvements to other public transport
November 28, 2026 at 9:21 PM
Even the new Euston alignment for HS2 is really doing a lot of work as a commuter rail capacity improvement disguised as an intercity project.

Right now the WCML runs a 10 TPH off peak timetable on intercity trains which is both high, exacerbated by the fact no train can serve two destinations.
November 25, 2026 at 4:49 AM
Didn't realise Nickel Plate Road No.765 has been transported from the US and now runs on the WCML, but according to
The Herald it does. Or maybe whoever selected the image saw this one and thought "this'll do". Sigh.
November 24, 2026 at 11:53 AM
WCML does it in Welsh?!
November 22, 2026 at 10:42 PM
For all confused by the post previously, BioRail is my fiction operator that runs mainly on the wcml and to other places, There are BioRail Liverys on the creators club in tsw so if you, you can download them there
November 24, 2026 at 4:08 PM
You're kidding, right? Thanks to travelling a lot on the WCML with Welsh announcements my kids can do it in English and Welsh and will remember the number till they die.

I think perhaps you and everyone you know are very stupid and dull, possibly innumerate.
November 22, 2026 at 10:40 PM
Lumo is continuing to champion career opportunities for young people and runs a number of work experience placements to show students what the railway industry has to offer. #apprenticeships #awards #carlisle #crewe #edinburgh #glasgow #greenfaulds
Lumo celebrates 63 new apprenticeships on Stirling route
This year has been a good one for Lumo. The open access operator is celebrating a year of championing apprenticeships and launching a new route on the West Coast Main Line (WCML).
www.railadvent.co.uk
November 24, 2026 at 3:10 PM
Most OA services are poorly-disguised moneygrabs, but Manchester to St Pancras is actually a great one - very much enjoyed the service that ran on this route in the early 2000s during the WCML upgrades
Grand Central bids to launch new Manchester-London rail service - Rail UK
Arriva’s open access operator, Grand Central, has submitted an application to the Office of Rail and Road (ORR) to launch a new direct rail service between
railuk.com
November 23, 2026 at 11:44 AM
Crosscountry is bad, stop it interlining with the WCML, MML, ECML and WAML, ASAP.

We aren't Switzerland, we're Japan without a mature HSR network.
kinda neat that the UK has a whole extra passenger rail network centered on their second largest metropolis www.instagram.com/reels/Df2oND...
November 19, 2026 at 5:06 PM
Today's #BRNostalgia is from 1991, when Class 85s could still be found on the WCML. Here's 85018 about to take empty stock from #Manchester Piccadilly to Longsight. paulbigland.zenfolio.com/p651486993/e... #railways #photography #nostalgia
The BR gallery. | 02598. 85018. Working ECS stock to Longsight depot. Manchester Piccadilly. 19.06.1991
Paul Bigland Photography
PaulBigland.zenfolio.com
November 19, 2026 at 12:44 PM
I think it is just the Caergybi services. Certainly haven't heard it on my occasional Birmingham - Crewe run on Avanti or should that be Cryw. You will hear it on TfW services where they use the WCML and its branches.
November 22, 2026 at 11:00 PM
Yeah, and not to repeat myself, but without a bigger Euston, Manchester and Birmingham wouldn't see any real benefit from faster trains. They'd go faster but you wouldn't move any more people per hour on the WCML, because you're still constrained by the capacity at the busiest end
November 20, 2026 at 4:08 PM
1) because the 373 trains are life expired, and no one is ordering new ones compatible with UK loading gauge
2) there are no passport control facilities in Birmingham
3) the North London line to connect WCML to HS1 is heavily congested
4) no operator wants to touch it
November 17, 2026 at 10:30 AM
Unfortunately the city regions of the West Midlands (#2 ~2.95M), Greater Manchester (#3 2.91M), and Liverpool (#7 ~1.57M) are all on the WCML.
en.wikipedia.org/wiki/List_of...
November 17, 2026 at 3:47 PM
What Carlisle needs in order of priority are
1 Faster trains to Newcastle
2 Reliable trains on WCML
3 Better local buses/bus & cycle lanes/park & ride
4 Safer pedestrian pavements*

*Istanbul pavements are shockingly awful even compared to Kampala etc
November 18, 2026 at 2:29 AM
I always know OTA broadcaster WCML to have the best motorsports coverage. Shame they never made the switch away from analog broadcasting
November 17, 2026 at 1:31 AM
HS1 leaves the tunnel near King’s Cross and then routes straight onto the north London line to access the WCML at Camden junction.
HS1 was supposed to connect to HS2 but they cancelled that too 🤬
November 16, 2026 at 10:31 AM
first ever WCML train to ever arrive early
November 16, 2026 at 12:30 AM
Beeching seems to have done a lot more damage to the trips that don’t involve London.

Also the Great Central mainline should’ve been kept around to take to take through freight off of the WCML and Midland mainline.
November 15, 2026 at 3:45 AM
Got all those & the WCML versions early on
November 13, 2026 at 6:38 PM
Do you not think the release of capacity to run 100s of extra local, regional and freight trains on the WCML was not a benefit? I know you struggle to understand how HS2 works but this is quite a basic concept
November 16, 2026 at 4:23 PM
also on things like the WCML is the freight run on the fast tracks or slow tracks.
November 15, 2026 at 5:13 PM
Any study into resolving the WCML/Midlands bottleneck/aging infrastructure will return one result - build additional capacity.
BCRs for rail are badly calculated too - the last 3 new lines to open have completely outtstipped their predicted ridership rates
November 15, 2026 at 7:16 PM