Van 12 november tot en met 4 december 2026 voert Fluvius nutswerken uit in Stasegemdorp. Er worden 400V-kabels aangelegd. Tegelijk plaatst Wyre ook glasvezelkabels.
The post Nutswerken in Stasegemdorp van 12 november tot 4 december...
Van 12 november tot en met 4 december 2026 voert Fluvius nutswerken uit in Stasegemdorp. Er worden 400V-kabels aangelegd. Tegelijk plaatst Wyre ook glasvezelkabels.
The post Nutswerken in Stasegemdorp van 12 november tot 4 december...
https://www.tomshardware.com/tech-industry/drones/us-army-successfully-flies-a-hybrid-electric-drone-with-3d-printed-heavy-fuel-rotary-engine-400v-motor-generator-uses-advanced-engineering-to-ditch-a-bulky-liquid-cooling-system
https://www.tomshardware.com/tech-industry/drones/us-army-successfully-flies-a-hybrid-electric-drone-with-3d-printed-heavy-fuel-rotary-engine-400v-motor-generator-uses-advanced-engineering-to-ditch-a-bulky-liquid-cooling-system
150 mi for a car that size is easily doable with ~50kWh, so to add that in 10 min, we need 300kW of charging power. An 800V battery needs a 375A charging current for that compared to an eye-popping 750A for a 400V one.
I'm glad BMW finally came onboard.
150 mi for a car that size is easily doable with ~50kWh, so to add that in 10 min, we need 300kW of charging power. An 800V battery needs a 375A charging current for that compared to an eye-popping 750A for a 400V one.
I'm glad BMW finally came onboard.
Jag bröt strömmen, mätte, tog bort elementen och skruvade dit uttagen. När jag slog på igen mätte jag spänningen i uttagen.
400V? Vafan?
Jag bröt strömmen, mätte, tog bort elementen och skruvade dit uttagen. När jag slog på igen mätte jag spänningen i uttagen.
400V? Vafan?
Det tog mig ytterligare två timmars svordomar att identifiera rätt blå kabel i råttboet till elcentral, och koppla den som nolla.
Det tog mig ytterligare två timmars svordomar att identifiera rätt blå kabel i råttboet till elcentral, och koppla den som nolla.
3 phase nearly possible everywhere after a change.
400v with 16A as standard.
For households.
Although solar and electrification has limited that last possibility with very long wait times.
Overcrowded lower grids.
3 phase nearly possible everywhere after a change.
400v with 16A as standard.
For households.
Although solar and electrification has limited that last possibility with very long wait times.
Overcrowded lower grids.
Oder sogar 400V 32A.
Oder sogar 400V 32A.
- Designed for high-efficiency, sustainable data center infrastructure
- 800V architecture reduces power loss vs. traditional 400V systems
- Expands Allegro's footprint in the fast-growing AI hardware supply chain
- Designed for high-efficiency, sustainable data center infrastructure
- 800V architecture reduces power loss vs. traditional 400V systems
- Expands Allegro's footprint in the fast-growing AI hardware supply chain
Wenn das ein Strommast ist, würde aufgrund der vielen Kabelberührungen permanent Kurzschluss sein.
Strommasten für Niederspannung (230/400V) haben in der Regel 2 oder 3 nicht isolierte Drähte, selten 4, die sich nicht berühren.
Wenn das ein Strommast ist, würde aufgrund der vielen Kabelberührungen permanent Kurzschluss sein.
Strommasten für Niederspannung (230/400V) haben in der Regel 2 oder 3 nicht isolierte Drähte, selten 4, die sich nicht berühren.