#DSTT
What each 3GPP release added to Time-Sensitive Communications - www.5g-mag.com/docs/tsc.pdf - a good summary from a recent update by 5G-MAG

#Free5Gtraining #3G4G5G #5GMAG #3GPP #5G #5GAdvanced #5Gsystem #TSC #IEEE #TSN #SMPTE #NWTT #DSTT #TSCTSF #Specifications
October 27, 2026 at 10:31 AM
#PreScareGame_MUC

" เป็นผู้ชายลงเชียร์​น่ะหรอ? เจ๋งดี​ "

เขาพยักหน้าเหมือนยอมรับได้ความเจ๋งของอีกฝ่าย​ พลางกระดกดื่มน้ำในรวดเดียว​ ก่อนจะร้องออกมา

" อึ๋ย​ เย็นเจี๊ยบเลยแหะ​ "

" ซ้อมหรอ?​ ซ้อมสิ​ ฉันลง​ dstt ไป​ แต่วันนี้ฉันเป็นคนดีน่ะ​ เลยมาแจกน้ำ​ "

" ว่าแต่นายเถอะ​ ซ้อมเป็นไง​ สนุกรึเปล่า​ "
October 5, 2026 at 1:14 PM
Going which way? Is the DSTT blocked?
September 29, 2026 at 5:56 PM
The poor reliability of the DSTT (and the rest of the tunnel from Westlake to UW) is obvious, but the need for a second Link-only tunnel from Westlake to CID is debatable. DSTT2, as designed, would not be a more viable backup for DSTT closures than surface transit is today. That’s bad!
September 25, 2026 at 1:25 PM
Southbound 1 and 2 line trains seem to be backed up at least in the DSTT. Been stuck in Pioneer Sq for about 5 minutes now, and they played a "we are experiencing an extended delay" announcement

#Seattle #Linklightrail #1line #2line
September 20, 2026 at 7:49 PM
Again, we should always remember to throw the stuff out there because not only is he protecting a pedophile, a rapist, but he’s also a fascist to the core. He even helped the pharmaceutical company Purdue get off their indictment and charges because of his Senate vote.

youtube.com/watch?v=dstt...
J.D. Vance & Misinformation #lastweektonight
YouTube video by LastWeekTonight
youtube.com
September 10, 2026 at 2:59 AM
The existing DSTT helped grade separate it but also our terrain made that almost required. Light rail has pitch limitations so we kinda fell into the grade separation by accident. Maybe I’m wrong tho. The only stretch at grade really is South Seattle where activists there advocated at grade
September 9, 2026 at 4:13 PM
might wanna see if it'll work with pico loader, then you might not need the dstt launcher depending on if you can flash it or not.

if you are just using it for just games why not twilightmenu++?
September 7, 2026 at 8:30 AM
some day i want to get one of those fucked up carts with a CPU in it just for the novelty, but also i barely use my DS as is

this R4 knockoff is so old that the only way i can use it on my 3DS is with a DSTT launcher installed as DSiWare, but it does work, and feels more reliable than nds-bootstrap
September 6, 2026 at 9:33 PM
I don’t have a problem with the tunnel…if it’s connected with the DSTT and the Ballard Line on an ALM system with radically smaller stations.
August 13, 2026 at 10:05 PM
The original DSTT was bored between stations which is pretty wild considering how close the stops are
October 9, 2025 at 4:28 AM
Pretty much nobody is going support shutting down the DSTT for years. It's core infrastructure needed to deliver service. There's not even an OMF (train yard) located north of the facility. If it wouldn't be feasible to keep the DSTT open while building the new lines, then the idea will be dropped.
September 9, 2025 at 11:11 PM
Are you planning on doing all of this before the World Cup?

I really doubt we're going to see any major changes over the next 4 years.
Trying to move the DSTT to accommodate some lazy people is comical. Making the region friendlier to pedestrians would be good.
January 23, 2025 at 7:41 AM
i should clarify that in this dream we still built the second tunnel, and have track connections between the two tunnels in sodo. lines can feed from west seattle, redmond, and the south end into the existing DSTT and the new tunnel to ballard can receive service from west seattle and the south end
December 6, 2025 at 11:33 PM
but we’re not destroying any track connections right? pardon my crude crayonning from literally on the train rn, but if we can upgrade the DSTT to better frequencies like balducci was advocating for, there’s no reason we couldn’t run a shorter urban service in addition to the 2 and 3 lines, right?
December 6, 2025 at 11:17 PM
El fin de semana pasado desmonté mi NDS Lite para arreglarla porque el lector de cartuchos iba regular y el botón L tenia el muelle algo suelto. Ya está arreglada, el DSTT funciona perfectamente y he metido dentro 89 juegos. Es posible que vaya dropeando info de vez en cuando de lo que vaya jugando
March 28, 2025 at 9:24 AM
A second tunnel isn't just for the stupid regional spine extensions. It's also for everything in seattle proper and the eastside, including ballard and ST4, with capabilities for *all* line 1-3 passengers when the DSTT is disrupted.

It must carry over a hundred thousand daily riders.
September 8, 2025 at 11:01 PM
Never even heard of Brickyard and moved here post-DSTT. Fascinating.
August 30, 2025 at 7:02 AM
The main and clear solution is to bring the CID storage track into use for disruption management, sim. to northgate's storage track, and to add in-station crossovers in the DSTT.

Lynnwood is fine, and does indeed have multiple track switches including one before the station.
August 25, 2025 at 5:16 PM
They can test the bridge segment fairly easily, by comparison. If they need to do repeated tests there, that's fine.

The CID connection tests are much harder, requiring full DSTT shutdowns each time they need to do a test.

And that connection has been slightly harder to QA because of live trains.
July 29, 2025 at 5:57 AM
It was going to be start of service to 1pm, including testing interlining at CID station. The DSTT would be closed to the 1 line during these hours.
July 29, 2025 at 2:07 AM
Genuinely don't know why we haven't installed crossover tracks in the DSTT yet.
June 26, 2025 at 7:39 PM
False fire alarm sounding throughout Sound Transit’s Downtown Seattle Transit Tunnel (DSTT). Fire department dispatched to resolve.
November 12, 2024 at 5:55 PM
This is the first major mech disruption since interlining began, so I'm not sure what you're talking about. Independent of this physical damage, there's def resilience work that needs done (esp. UW-Northgate & DSTT segments). As far as comms, they had a video out quickly and kept svc alerts updated.
July 10, 2026 at 3:20 PM