#PLDCC
30 Hudson Yards used Aquaerix®-HD PLDCC—lightweight rooftop support at 1,100 ft elevation.

Learn more:
https://aerixindustries.com/featured-case-studies/

#NewYorkCity #VerticalConstruction #AQUAERiX #HighRise #RooftopSupport #AerixIndustries
July 13, 2026 at 2:00 PM
Sacramento project used Aquaerix®-HD PLDCC—16,500 yd³ to protect sewer mains & reduce load.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Sacramento #Transportation #LoadMitigation #AQUAERiX #UtilityProtection #AerixIndustries
June 4, 2026 at 2:00 PM
Aquaerix®-HD PLDCC replaced geofoam behind Portland’s new reservoir, providing drainage, reduced buoyancy, and seismic resilience.

Learn more: https://aerixindustries.com/featured-case-studies/

#Portland #WaterInfrastructure #AQUAERiX #AerixIndustries
September 15, 2026 at 2:00 PM
Perth Amboy’s waterfront park used Aquaerix®-HD PLDCC to support a retaining wall along the Arthur Kill River.

Learn more:
https://aerixindustries.com/featured-case-studies/

#PerthAmboy #WaterfrontPark #RetainingWallBackfill #AQUAERiX #RiverbedRemediation #AerixIndustries
August 26, 2026 at 2:00 PM
Oyster Point used Aquaerix®-HD PLDCC to raise 81 acres of bayfront land while reducing settlement risks.

Learn more:
https://aerixindustries.com/featured-case-studies/

#SanFrancisco #UrbanDevelopment #SeaLevelRise #AQUAERiX #LandReclamation #AerixIndustries
August 25, 2026 at 2:00 PM
Sacramento’s 25-story headquarters used Aquaerix®-HD PLDCC for structural support and groundwater management.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Sacramento #CommercialConstruction #HydrostaticMitigation #AQUAERiX #PermeableBarrier #AerixIndustries
August 20, 2026 at 2:00 PM
Louis Armstrong Airport used Aquaerix®-HD PLDCC for lightweight, permeable airfield subgrade support.

Learn more:
https://aerixindustries.com/featured-case-studies/

#NewOrleans #Aviation #SoilRemediation #AQUAERiX #PermeableSubbase #AerixIndustries
August 7, 2026 at 2:01 PM
LIRR Jamaica Queens used Aquaerix®-HD PLDCC—permeable backfill, faster install, wall stability.

Learn more:
https://aerixindustries.com/featured-case-studies/

#JamaicaQueens #Railway #PermeableBackfill #AQUAERiXHD #WallStabilization #AerixIndustries
July 29, 2026 at 2:00 PM
Camp Pendleton bridge rehab used Aquaerix®-HD PLDCC for stable, permeable embankment support.

Learn more:
https://aerixindustries.com/featured-case-studies/

#SanDiego #Railway #BridgeRepair #AQUAERiX #WaterfrontConstruction #AerixIndustries
July 7, 2026 at 2:00 PM
Fore River Bridge used Aquaerix®-HD PLDCC—6,000 yd³ for fast install & long-term stability.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Boston #Infrastructure #BridgeApproach #AQUAERiX #AcceleratedConstruction #AerixIndustries
June 25, 2026 at 2:00 PM
Enlow Fork used Aquaerix®-HD PLDCC—roof stabilization + water control with permeable backfill.

Learn more:
https://aerixindustries.com/featured-case-studies/

#EastFinley #Mining #WaterControl #AQUAERiX #RoofStabilization #AerixIndustries
June 18, 2026 at 2:00 PM
Dowd Junction used Aquaerix®-HD PLDCC—lightweight, permeable backfill for landslide stabilization.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Vail #Infrastructure #LandslideRemediation #AQUAERiX #HydrostaticPressure #AerixIndustries
June 16, 2026 at 2:00 PM
Delaware interchange used Aquaerix®-HD PLDCC—17,500 yd³ for load reduction & drainage.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Delaware #Infrastructure #SettlementMitigation #AQUAERiXHD #MSEWallBackfill #AerixIndustries
June 15, 2026 at 2:00 PM
Citi Field used Aquaerix®-HD PLDCC—17,500 yd³ for load reduction + drainage, saving $500K.

Learn more:
https://aerixindustries.com/featured-case-studies/

#Queens #SportsInfrastructure #AQUAERiX #PermeableSubbase #LoadMitigation #AerixIndustries
May 22, 2026 at 2:00 PM
At the 2424 Tulane project in New Orleans, PLDCC created a permeable stormwater detention system beneath the foundation slab.

Learn more:
https://aerixindustries.com/featured-case-studies/

#NewOrleans #ResidentialConstruction #PermeableDetention #StormwaterManagement #PLDCC
April 6, 2026 at 2:00 PM
🌊 Oyster Point raised 6 ft with AQUAERiX® PLDCC 🏗️ Lightweight, permeable, & stable ⚖️ Controlled water infiltration 💧 supports a safer, greener future 🌱
Learn more: http://ow.ly/6XA850JpqBq

#AerixIndustries #PLDCC #Aquaerix #SeaLevelRise #SmartCities
March 31, 2026 at 2:00 PM
💧 Portland’s new reservoir uses 13,434 CY Aquaerix® PLDCC
Strong, permeable, and seismic-resistant utilities installed between 17 lifts ⚡ Ensuring resilient, future-ready water infrastructure
Learn More: https://aerixindustries.com/featured-case-studies/

#AerixIndustries #Aquaerix #WaterSecurity
March 23, 2026 at 2:00 PM
🚆 Portal North Bridge uses 4,265 cy of Aquaerix® PLDCC 🏗️ to safely & efficiently backfill 18’ soldier piles ⚡

Minimal disruption, faster & more reliable transit!
https://ow.ly/Xfrv50XS8UY

#AerixIndustries® #Aquaerix® #PLDCC #TransitInfrastructure
March 6, 2026 at 3:00 PM
A 4-person crew pumped Permeable LDCC with Aquaerix up to 35’ high in 5–6’ lifts—efficient, minimal equipment impact, and cost-saving. Pumped 500’ from site!

Learn more 👉https://aerixindustries.com/featured-case-studies/

#AerixIndustries #PLDCC #Aquaerix #CivilEngineering
February 27, 2026 at 3:00 PM
Green Beach North Bridge at Camp Pendleton was repaired without disrupting rail service! 🚂

580 CY of AQUARiX® PLDCC placed in 2 weeks for lightweight, permeable, long-term stability.

Learn more 👉 https://ow.ly/6x4I50VmyPx
#AerixIndustries #PLDCCGreen
February 24, 2026 at 3:00 PM
Project Spotlight: 💡
St. Joseph Academy in New Orleans was stabilized using 460 CY of Aerix AQUAERiX™ PLDCC—installed in 3 days to resist buoyancy and preserve structural integrity. 🏛️
🔗 https://ow.ly/fjT850X5VPI

#AerixIndustries #PLDCC #HistoricPreservation
February 8, 2026 at 3:00 PM