It’s £190 for a 4TB IronWolf HDD
It’s £300-500 for a 4TB SSD!
So instead I spent £550 on used 60TB JBOD Server instead.
That’s £9.16 per TERABYTE.
It’s £190 for a 4TB IronWolf HDD
It’s £300-500 for a 4TB SSD!
So instead I spent £550 on used 60TB JBOD Server instead.
That’s £9.16 per TERABYTE.
24G SAS-4 vs. NVMe in High-Density Expansion Storage JBOD Enclosures #SAS4 #NVMe #JBOD #JBOF #StorageArchitecture #EnterpriseStorage #DataCenter #HighDensityStorage #HardDrives #SSD #EDSFF #PCIeGen5 #Broadcom #DataInfrastructure #TechComparison #univold
24G SAS-4 vs. NVMe in High-Density Expansion Storage JBOD Enclosures #SAS4 #NVMe #JBOD #JBOF #StorageArchitecture #EnterpriseStorage #DataCenter #HighDensityStorage #HardDrives #SSD #EDSFF #PCIeGen5 #Broadcom #DataInfrastructure #TechComparison #univold
Theoretically, 10x dupes could only speed up loads on a JBOD setup *IF* the data ended up on both sides of the JBOD line.
Theoretically, 10x dupes could only speed up loads on a JBOD setup *IF* the data ended up on both sides of the JBOD line.
(I was a small part of the team that build the Sun Fire X4500, aka, Thumper. I even put an easter egg in the service console.)
(I was a small part of the team that build the Sun Fire X4500, aka, Thumper. I even put an easter egg in the service console.)
Compute is where the watts go.
A JBOD filled with 40+ hard drives is going to be less than 1000watts. Meanwhile, 2 graphics cards performing AI workloads can use that much power non-stop.
Compute is where the watts go.
A JBOD filled with 40+ hard drives is going to be less than 1000watts. Meanwhile, 2 graphics cards performing AI workloads can use that much power non-stop.